BLD-Final | 9/28/1999 | 9/28/1999 | 9/28/1999 | P | PASS |
Bob Archibald
|
|
|
Ceiling ok. ok For final.
|
BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | FAIL |
Tom Arcoraci
|
|
|
ceiling call first don ###-#### To be done by 325
|
FIRE-Final Inspection | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | PASS |
Joe Tawney
|
|
|
don ###-#### reinspection Reinsp ok for permanent occupancy
|
Permanent Occupancy | | 9/28/1999 | 9/28/1999 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/24/1999 | 9/27/1999 | 9/27/1999 | A | FAIL |
Tom Arcoraci
|
|
|
ceiling grid ###-#### Remove tiles for grid inspection
|
FIRE-Final Inspection | 9/24/1999 | 9/27/1999 | 9/27/1999 | A | FAIL |
Joe Tawney
|
|
|
Don ###-#### Reinsp. Fail door hardware
|
FIRE-Final Inspection | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | FAIL |
Joe Tawney
|
|
|
DON ###-#### FN FIRE Door hardware AHU Led's and test f detectors
|
BLD-Final | 9/23/1999 | 9/24/1999 | 9/23/1999 | A | FAIL |
Carl Dependahl
|
|
|
DON ###-#### FN OCC Need fire & ceiling grid inspections
|
FIRE-Final Inspection | 9/21/1999 | 9/22/1999 | 9/22/1999 | P | PART |
Joe Tawney
|
|
|
###-#### pre-final conference
|
BLD-Framing/Rough-in | 9/15/1999 | 9/15/1999 | 9/15/1999 | | PART |
|
|
|
ADD INSPCTN PER 340
|
INSP - Framing/Rough-in | 8/16/1999 | 8/17/1999 | 8/18/1999 | P | PART |
Carl Dependahl
|
|
|
08/17/99 340 - DON-- ###-#### FR INSP; PART; OK TO COVER PEND ELEC AT NU
|
INSP - Framing/Rough-in | 8/11/1999 | 8/11/1999 | 8/11/1999 | P | PART |
Carl Dependahl
|
|
|
08/11/99 340 - DON ###-####; ok to cover part's, add braces & need compl
|
INSP - Framing/Rough-in | 8/5/1999 | 8/6/1999 | 8/6/1999 | P | PART |
Carl Dependahl
|
|
|
08/06/99 340 - DON ###-#### OK TO 1 SIDE INT PART'S
|
INSP - Framing/Rough-in | 7/30/1999 | 8/2/1999 | 8/2/1999 | P | PART |
Wes Worcester
|
|
|
08/02/99 342 - TOM ###-#### ok to cover one side....need plumbing and el
|