BLD-Final | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 10:07:33. Contact: ###-####. made ok with all signoffs 2/14/00 11:01:58 AM
|
Permanent Occupancy | | 2/2/2000 | 2/2/2000 | | DONE |
|
|
|
|
BLD-Final | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 10:04:15. Contact: ###-####. signed the temp col c/n removed 1/27/00 6:35:08 PM
|
FIRE-Final Inspection | 1/27/2000 | 1/27/2000 | 1/27/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 10:03:34. Contact: ###-####. occ. approved 1/28/00 8:42:39 AM
|
BLD-Final | 1/24/2000 | 1/25/2000 | 1/25/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 10:04:47. Contact: ###-####. c/n issued see bld99-00901 1/26/00 8:16:00 AM
|
FIRE-Final Inspection | 1/24/2000 | 1/25/2000 | 1/25/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/24/2000 at 09:59:46. Contact: ###-####. C/N issued. 1/25/00 1:34:49 PM
|
FIRE-Final Inspection | 12/27/1999 | 12/28/1999 | 12/28/1999 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 14:38:11. Contact: ###-####. Sprinkler R/I inpsection- penetrations; recessed sprinklers painted, opening in corridor by duct requires damper.
|
BLD-Final | 12/27/1999 | 12/28/1999 | 12/23/1999 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 14:37:28. Contact: ###-####. Ok to drop in tiles- need to move sprink. pipe out of fire proofing over ramp.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/15/1999 | 11/15/1999 | A | PART |
|
|
|
ron ###-#### fr insp 1st floor "E".
|
BLD-Framing/Rough-in | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PART |
|
|
|
RON--- ###-#### FR made ok to cover section E
|
BLD-Framing/Rough-in | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | PART |
|
|
|
st. lukes\\###-#### Area B and C ok to cover
|
BLD-Framing/Rough-in | 9/30/1999 | 9/30/1999 | 9/30/1999 | P | PART |
|
|
|
WALL COVER RON ###-#### 2ND FLOOR OK to cover "A" section
|