Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01627
StatusFinaled
Name ADAMS JULISA KATHRYN L
Site Address 1111 W MELROSE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 624 sq. ft. two car garage to the side of a existing residence with a 624 sq. ft. living area above garage. Living area to include a bedroom with a bathroom and a 96 sq. ft. deck of the side of the bedroom. Per approved plans and all red-lining. Battery powered smoke detectors required per code in existing residence. One hour separation is required between garage and ALL living areas. Structure not to exceed 22' in height per Angie B. (Planning and Zoning). (sam)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/13/200012/15/200012/15/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/13/2000 at 12:39:50. Contact: ###-####. l/c isued. 12/15/2000 4:53:42 PM
BLD-Final8/25/20008/25/20008/25/2000PFAIL
DetailsJim Storey
###-####
BLD-Final8/25/20008/25/20008/25/2000PFAIL
DetailsJim Storey
###-####
FIRE-Final Inspection8/24/20008/24/20008/24/2000PCANC
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/24/2000 at 10:22:00. Contact: ###-####. This is a residence. 8/25/2000 7:41:23 AM
BLD-Energy code compliance1/23/20001/24/20001/24/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/23/2000 at 18:46:14. Contact: ###-####.
BLD-Energy code compliance11/26/199911/26/199911/26/1999APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/26/1999 at 07:19:30. Contact: ###-####. Partial inspection ok upper floor, still has stairway area to insulate.
BLD-Framing/Rough-in11/8/199911/8/199911/9/1999PPASS
DetailsJim Storey
Jules Adams ###-####
BLD-Framing/Rough-in11/2/199911/2/199911/2/1999AFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/02/1999 at 05:26:57. Contact: ###-####. Not ready will re-call for J. Storey
BLD-Framing/Rough-in10/27/199910/28/199910/28/1999ANR
DetailsJim Storey
reinspection jules ###-#### Pend mech Bew hanger, top plate stud's MCEC sealants
BLD-Framing/Rough-in10/5/199910/6/199910/6/1999AFAIL
DetailsWes Worcester
jules ###-#### nail shear per plans
INSP - Foundation8/5/19998/5/19998/5/1999PPART
DetailsJim Storey
08/05/99 301 - conf iok
INSP - Foundation7/14/19997/15/19997/15/1999APASS
DetailsRuss Owen
note: set back at garage approx,19.5 foot,ok per Roger Green pLanning and zoning,as per Scott S. in line with house,also no a through sreet.
INSP - Foundation7/13/19997/14/19997/14/1999AFAIL
DetailsRuss Owen
set back at denver street not 20,also need a foarm added to footing of wallleft corrections posted.
INSP - Foundation7/8/19997/8/19997/8/1999PFAIL
DetailsJim Storey
07/08/99 301 - JULISA - ###-#### PERMIT BEHIND ELEC. PANEL, FOOTINGS no plan found pwoi