BLD-Final | 2/18/2000 | 2/23/2000 | 2/23/2000 | A | FAIL |
|
|
|
flush bolts have been installed at vestibule doors CSDI respectfully requests a final inspection please call Jeff at ###-####. Thankyou new flush bolts not operational 2/23/00 10:53:59 AM
|
BLD-Conference | 1/24/2000 | 1/24/2000 | 1/24/2000 | | CANC |
|
|
|
Talked w/Jeff re: status of temp. occ. on 3rd floor and he is working on changing out some doors and will request a final.
|
FIRE-Final Inspection | 11/17/1999 | 11/17/1999 | 11/17/1999 | P | FAIL |
Rick Jackson
|
|
|
ken ###-#### need smoke detectors for smoke dampers.
|
BLD-Framing/Rough-in | 11/5/1999 | 11/5/1999 | 11/5/1999 | P | PART |
|
|
|
APPROVAL TO DROP CEILING TILE 3829 Ok to drop in tile.
|
FIRE-Sprinkler Rough-in | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | FAIL |
Rick Jackson
|
|
|
###-#### --ED---NEED TO HAVE CORRECTION-FOR ACCESS DOOR Access door for damper needed at shaft wall
|
FIRE-Sprinkler Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PASS |
Rick Jackson
|
|
|
KEN ###-#### Ok to cover
|
BLD-Framing/Rough-in | 10/12/1999 | 10/13/1999 | 10/13/1999 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 13:56:32. Contact: ###-####. Ok to cover walls repair tunnel with needed on east hall/corridor.
|
FIRE-Conference | 9/20/1999 | 9/21/1999 | 9/21/1999 | | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/20/1999 at 13:26:06. Contact: ###-####. Requested fire alarm plans; Need resvbmital on mechanical plans; Reviewed plans with general contractor
|