Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01629
StatusFinaled
Name BOISE CITY OMBUDSMAN OFFICE
Site Address 150 N CAPITOL BLVD Unit: 3 FLR
Project NameCITY HALL-3RD FLR
Customer Number 
ePlanReviewNo
Description
(CITY HALL - 3RD FLOOR REMODEL) Fire sprinklers are used for building area increase. To remodel the Northeast corner of the 3rd floor. Work is to include fire-resistive corridor doors and windows, interior nonbearing walls, interior doors, suspended ceilings, and modifying two existing restrooms to be accessible to the disabled all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-426-99 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/18/20002/23/20002/23/2000AFAIL
Details
flush bolts have been installed at vestibule doors CSDI respectfully requests a final inspection please call Jeff at ###-####. Thankyou new flush bolts not operational 2/23/00 10:53:59 AM
BLD-Conference1/24/20001/24/20001/24/2000 CANC
Talked w/Jeff re: status of temp. occ. on 3rd floor and he is working on changing out some doors and will request a final.
FIRE-Final Inspection11/17/199911/17/199911/17/1999PFAIL
DetailsRick Jackson
ken ###-#### need smoke detectors for smoke dampers.
BLD-Framing/Rough-in11/5/199911/5/199911/5/1999PPART
Details
APPROVAL TO DROP CEILING TILE 3829 Ok to drop in tile.
FIRE-Sprinkler Rough-in10/25/199910/25/199910/25/1999PFAIL
DetailsRick Jackson
###-#### --ED---NEED TO HAVE CORRECTION-FOR ACCESS DOOR Access door for damper needed at shaft wall
FIRE-Sprinkler Rough-in10/21/199910/22/199910/22/1999APASS
DetailsRick Jackson
KEN ###-#### Ok to cover
BLD-Framing/Rough-in10/12/199910/13/199910/13/1999PPART
Details
Scheduled by a contractor via Hello! on 10/12/1999 at 13:56:32. Contact: ###-####. Ok to cover walls repair tunnel with needed on east hall/corridor.
FIRE-Conference9/20/19999/21/19999/21/1999 PART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 09/20/1999 at 13:26:06. Contact: ###-####. Requested fire alarm plans; Need resvbmital on mechanical plans; Reviewed plans with general contractor