Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-01704
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1662 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 17 (SECTION 1 OF 2) A TWO HOUR AREA SEPARATION WALL WILL BE USED TO DIVIDE THIS 24 UNIT TYPE III BUILDING INTO TWO SEPARATE BUILDINGS. * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. EACH FLOOR IS APPROXIMATELY 3,078 SQ.FT. AND CONTAINS FOUR UNITS, 2-TWO BEDROOMS, ONE BATHROOM UNITS @ 954 SQ.FT EACH AND 2-ONE BEDROOM ONE BATHROOM @ 585 SQ.FT. EACH. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING IS FIRE SPRINKLERED PER NFPA 13-R. MJP (P.C.# 438-99) REFER TO BLD 00-05 FOR OTHER SECTION OF THIS BUILDING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/5/20011/5/2001 DONE
Details
FIRE-Final Inspection12/20/200012/20/200012/21/2000PPASS
DetailsRick Jackson
###-#### frank fire fn
BLD-Energy code compliance9/20/20009/20/20009/20/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 07:21:36. Contact: ###-####. 2hr wall no complet. 9/20/2000 12:16:34 PM
BLD-Energy code compliance9/18/20009/19/20009/19/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 17:45:18. Contact: ###-####. 2hr wall not complet. 9/19/2000 9:41:08 AM
BLD-Energy code compliance9/11/20009/12/20009/12/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/11/2000 at 12:08:05. Contact: ###-####.
BLD-Energy code compliance9/8/20009/8/20009/8/2000PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/08/2000 at 10:49:37. Contact: ###-####. 9/8/2000 1:26:23 PM canc by contractor 9/8/2000 1:45:50 PM
BLD-Framing/Rough-in9/5/20009/5/20009/5/2000PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/05/2000 at 07:51:34. Contact: ###-####.
ok to insulate no. 1/4 of # 17 , pending other trade sign offs 9/5/2000 3:46:51 PM
FIRE-Supply Line Cover12/3/199912/6/199912/6/1999PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/03/1999 at 14:24:20. Contact: ###-####.
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS
DetailsRick Jackson
BLD-Foundation10/6/199910/7/199910/7/1999APART
DetailsTom Arcoraci
Preston ###-#### spec insp on site
BLD-Footing9/29/19999/30/19999/30/1999ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/29/1999 at 15:30:45. Contact: ###-####. SI
BLD-Footing9/29/19999/30/19999/30/1999ANR
DetailsJim Storey
Preston Baked ###-#### SI