BLD-Final | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 10:57:19. Contact: ###-####.
|
Permanent Occupancy | | 7/14/2000 | 7/14/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/11/2000 | 7/12/2000 | 7/13/2000 | A | PASS |
Rick Jackson
|
|
|
frank ###-####; occupancy approved
|
BLD-Framing/Rough-in | 2/29/2000 | 3/2/2000 | 3/2/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 11:12:10. Contact: ###-####. Canceled. 3/2/00 4:46:00 PM
|
BLD-Energy code compliance | 2/18/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/18/2000 at 15:18:16. Contact: ###-####. Ok to rock all areas except idems 1-3 on c/N. 2/23/00 1:53:31 PM
|
BLD-Framing/Rough-in | 2/16/2000 | 2/17/2000 | 2/17/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/16/2000 at 13:59:31. Contact: ###-####. Framing ok. 2/17/00 2:14:12 PM
|
BLD-Framing/Rough-in | 2/14/2000 | 2/15/2000 | 2/16/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/14/2000 at 14:51:17. Contact: ###-####. C/N on site. 2/16/00 1:25:45 PM
|
BLD-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
|
|
|
|
FIRE-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
Rick Jackson
|
|
|
|
FIRE-Sprinkler Rough-in | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
Rick Jackson
|
|
|
SHELLY-- ###-#### FIRE R/I supply line cover ok.
|
BLD-Conference | 10/29/1999 | 10/29/1999 | 10/29/1999 | A | PART |
Rick Jackson
|
|
|
With Bill Alexander and Stan Beus for depth of bury. Will cover with Insulation 2" to prevent freezing.
|
FIRE-Supply Line Cover | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Rick Jackson
|
|
|
Ok to cover- foam insulation over length of bury.
|
BLD-Footing | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | PART |
Jim Storey
|
|
|
preston ###-#### Pend Report
|