Permit NumberBLD99-01719
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1698 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 11, (SECTION 1 OF 2) A TWO HOUR AREA SEPARATION WALL WILL BE USED TO DIVIDE THIS TYPE I, 8 UNIT BUILDING INTO TWO SEPARATE BUILDINGS. * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 4 UNIT APARTMENT BUILDING. EACH UNIT IS 1206 SQ.FT. MULTI STORY, 2 BEDROOMS AND 2 AND 1/2 BATHROOMS, WITH A 560 SQ.FT. GARAGE. THE INSTALLATION OF A NFPA 13-R FIRE SPRINKLER SYSTEM IS REQUIRED AND CAN NOT BE UDE TO REDUCE ANY BUILDING CODE REQUIREMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. MJP (P.C.# 438-99) REFER TO BLD99-02803 FOR OTHER SECTION OF THIS BUILDING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20015/1/20015/1/2001PPASS
DetailsJim Storey
mike ###-#### fn occ
Permanent Occupancy 5/1/20015/1/2001 DONE
Details
BLD-Final4/27/20014/30/20014/30/2001AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/27/2001 at 14:21:35. Contact: ###-####. c/n on site 4/30/2001 11:24:08 AM
BLD-Final4/30/20014/30/20014/30/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/30/2001 at 11:21:53. Contact: ###-####. ok for temp pending p&z 4/30/2001 3:14:20 PM
FIRE-Final Inspection4/13/20014/13/20014/13/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 4/13/2001 9:31:25 AM
FIRE-Final Inspection4/11/20014/12/20014/12/2001PNR
DetailsRick Jackson
###-####
BLD-Energy code compliance1/2/20011/3/20011/3/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/02/2001 at 11:33:33. Contact: ###-####.
BLD-Energy code compliance12/30/20001/2/20011/2/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/30/2000 at 08:18:07. Contact: ###-####.
BLD-Framing/Rough-in12/30/20001/2/20011/2/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/30/2000 at 08:17:25. Contact: ###-####.
BLD-Energy code compliance12/29/200012/29/200012/29/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 09:57:10. Contact: ###-####.
BLD-Framing/Rough-in12/29/200012/29/200012/29/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 09:56:25. Contact: ###-####.
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS