Permanent Occupancy | | 8/18/2000 | 8/18/2000 | | DONE |
|
|
|
|
BLD-Final | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/17/2000 at 08:26:18. Contact: ###-####. final ok. 8/18/2000 3:30:10 PM
|
FIRE-Final Inspection | 8/17/2000 | 8/17/2000 | 8/17/2000 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/17/2000
|
FIRE-Final Inspection | 8/16/2000 | 8/16/2000 | 8/16/2000 | P | NR |
Rick Jackson
|
|
|
###-#### FRANK --FIRE FN-RE-INSP will call to reschedule 8/17/2000 3:25:36 PM
|
FIRE-Final Inspection | 8/15/2000 | 8/15/2000 | 8/15/2000 | P | NR |
Rick Jackson
|
|
|
###-####--FRANK ----FIRE FN called and said they will reschedule 8/16/2000 12:42:11 PM
|
FIRE-Final Inspection | 8/14/2000 | 8/14/2000 | 8/14/2000 | P | NR |
Rick Jackson
|
|
|
FRANK-- ###-#### FIRE FN will reschedule 8/15/2000 11:15:36 AM
|
FIRE-Alarm Testing | 7/27/2000 | 7/27/2000 | 7/27/2000 | A | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/27/2000 alarms not 70db in bedrooms
|
BLD-Energy code compliance | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 17:00:04. Contact: ###-####. frame and engery ok 4/27/00 4:07:51 PM
|
BLD-Energy code compliance | 4/25/2000 | 4/26/2000 | 4/26/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 16:47:36. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 07:07:57. Contact: ###-####.
|
BLD-Energy code compliance | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 17:04:02. Contact: ###-####. east 6 units ok for framing and engery code. ok to cover only these units. 4/18/00
|
BLD-Framing/Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####. mlb to i beam in grage area to have engineered fix for wrong atchment aplacation per simpson book/ need wall type designation for staair encloser not listed on approved drawing. 4/12/00
|
BLD-Framing/Rough-in | 4/10/2000 | 4/11/2000 | 4/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 07:27:05. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/29/2000 | 3/29/2000 | 3/29/2000 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/29/2000 at 07:27:05. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/24/2000 | 3/24/2000 | 3/24/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 07:21:10. Contact: ###-####.fire stopping of floor system at prerock areas at drop locations ok. 3/24/00 10:40:04 AM
|
BLD-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
|
|
|
|
FIRE-Conference | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | PASS |
Rick Jackson
|
|
|
|
FIRE-Sprinkler Rough-in | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/01/1999 at 15:22:12. Contact: ###-####. Supply line cover inspection- ok to cover
|
BLD-Foundation | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | PART |
Jim Storey
|
|
|
PRESTON PSIR
|