Permit Information
Permit NumberBLD99-01720
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1614 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 6, TYPE II, 12 UNITS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4-ONE BEDROOM, ONE BATHROOM @ 790 SQ.FT EACH WITN 2684 SQ.FT OF GARAGE AREA. THE SECOND FLOOR CONTAINS 1-ONE BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH. 1- THREE BEDROOM TWO BATHROOM UNIT @ 1344 SQ.FT. THE THIRD FLOOR CONTAINS 1-ONE-BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH AND 1-THREE BEDROOM TWO BATHROOM UNIT AT 1344 SQ.FT. THE FIRST FLOOR IS APPROXIMATELY 3160 SQ.FT. FOR LIVING AREA THE SECOND FLOOR IS APPROXIMATELY 4426 SQ.FT. OF LIVING AREA THE THIRD FLOOR IS APPROXIMATELY 4426 SQ.FT. FOR LIVING AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING MUST BE FIRE SPRINKLERED TO MEET NFPA 13-R. MJP (P.C.# 438-99)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/18/20008/18/2000 DONE
Details
BLD-Final8/17/20008/17/20008/17/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/17/2000 at 08:26:18. Contact: ###-####. final ok. 8/18/2000 3:30:10 PM
FIRE-Final Inspection8/17/20008/17/20008/17/2000PPASS
DetailsRick Jackson
Added by Inspector: 409 On 8/17/2000
FIRE-Final Inspection8/16/20008/16/20008/16/2000PNR
DetailsRick Jackson
###-#### FRANK --FIRE FN-RE-INSP will call to reschedule 8/17/2000 3:25:36 PM
FIRE-Final Inspection8/15/20008/15/20008/15/2000PNR
DetailsRick Jackson
###-####--FRANK ----FIRE FN called and said they will reschedule 8/16/2000 12:42:11 PM
FIRE-Final Inspection8/14/20008/14/20008/14/2000PNR
DetailsRick Jackson
FRANK-- ###-#### FIRE FN will reschedule 8/15/2000 11:15:36 AM
FIRE-Alarm Testing7/27/20007/27/20007/27/2000AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 7/27/2000 alarms not 70db in bedrooms
BLD-Energy code compliance4/26/20004/27/20004/27/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/26/2000 at 17:00:04. Contact: ###-####. frame and engery ok 4/27/00 4:07:51 PM
BLD-Energy code compliance4/25/20004/26/20004/26/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/25/2000 at 16:47:36. Contact: ###-####.
BLD-Framing/Rough-in4/24/20004/24/20004/24/2000PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/24/2000 at 07:07:57. Contact: ###-####.
BLD-Energy code compliance4/17/20004/18/20004/18/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/17/2000 at 17:04:02. Contact: ###-####. east 6 units ok for framing and engery code. ok to cover only these units. 4/18/00
BLD-Framing/Rough-in4/10/20004/11/20004/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####. mlb to i beam in grage area to have engineered fix for wrong atchment aplacation per simpson book/ need wall type designation for staair encloser not listed on approved drawing. 4/12/00
BLD-Framing/Rough-in4/10/20004/11/20004/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/10/2000 at 18:03:26. Contact: ###-####.
BLD-Framing/Rough-in3/29/20003/29/20003/29/2000PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2000 at 07:27:05. Contact: ###-####.
BLD-Framing/Rough-in3/29/20003/29/20003/29/2000PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2000 at 07:27:05. Contact: ###-####.
BLD-Framing/Rough-in3/24/20003/24/20003/24/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/24/2000 at 07:21:10. Contact: ###-####.fire stopping of floor system at prerock areas at drop locations ok. 3/24/00 10:40:04 AM
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS
DetailsRick Jackson
FIRE-Sprinkler Rough-in11/1/199911/2/199911/2/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/01/1999 at 15:22:12. Contact: ###-####. Supply line cover inspection- ok to cover
BLD-Foundation10/21/199910/21/199910/21/1999PPART
DetailsJim Storey
PRESTON PSIR