Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-01725
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1686 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 13, TYPE II, 12 UNITS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4-ONE BEDROOM, ONE BATHROOM @ 790 SQ.FT EACH WITN 2684 SQ.FT OF GARAGE AREA. THE SECOND FLOOR CONTAINS 1-ONE BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH. 1- THREE BEDROOM TWO BATHROOM UNIT @ 1344 SQ.FT. THE THIRD FLOOR CONTAINS 1-ONE-BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH AND 1-THREE BEDROOM TWO BATHROOM UNIT AT 1344 SQ.FT. THE FIRST FLOOR IS APPROXIMATELY 3160 SQ.FT. FOR LIVING AREA THE SECOND FLOOR IS APPROXIMATELY 4426 SQ.FT. OF LIVING AREA THE THIRD FLOOR IS APPROXIMATELY 4426 SQ.FT. FOR LIVING AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING IS FIRE SPRINKLERED PER NFPA 13-R. MJP (P.C.# 438-99)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20015/1/20015/1/2001PPASS
DetailsJim Storey
fn occ mike ###-####
Permanent Occupancy 5/1/20015/1/2001 DONE
Details
BLD-Final4/6/20014/6/20014/6/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/06/2001 at 11:10:09. Contact: ###-####. temp ok pending plm for perm sign off. 4/6/2001 3:58:14 PM
FIRE-Final Inspection3/16/20013/16/20013/16/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 3/16/2001 8:05:35 AM
FIRE-Final Inspection3/9/20013/12/20013/13/2001PNR
DetailsRick Jackson
###-####
BLD-Energy code compliance12/8/200012/11/200012/11/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/08/2000 at 15:03:14. Contact: ###-####. framing ok insulation ok 12/11/2000 3:23:27 PM
BLD-Energy code compliance11/30/200012/1/200012/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/2000 at 17:13:50. Contact: ###-####. pending first floor. 12/1/2000 3:46:08 PM
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS
DetailsRick Jackson