Permit Information
Permit NumberBLD99-01727
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1674 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 15, TYPE II, 12 UNITS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4-ONE BEDROOM, ONE BATHROOM @ 790 SQ.FT EACH WITN 2684 SQ.FT OF GARAGE AREA. THE SECOND FLOOR CONTAINS 1-ONE BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH. 1- THREE BEDROOM TWO BATHROOM UNIT @ 1344 SQ.FT. THE THIRD FLOOR CONTAINS 1-ONE-BEDROOM ONE BATHROOM UNIT @ 790 SQ.FT. 2-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH AND 1-THREE BEDROOM TWO BATHROOM UNIT AT 1344 SQ.FT. THE FIRST FLOOR IS APPROXIMATELY 3160 SQ.FT. FOR LIVING AREA THE SECOND FLOOR IS APPROXIMATELY 4426 SQ.FT. OF LIVING AREA THE THIRD FLOOR IS APPROXIMATELY 4426 SQ.FT. FOR LIVING AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING IS FIRE SPRINKLERED PER NFPA 13-R. MJP (P.C.# 438-99)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20015/1/20015/1/2001PPASS
DetailsJim Storey
mike ###-#### fn occ
Permanent Occupancy 5/1/20015/1/2001 DONE
Details
BLD-Final3/1/20013/2/20013/2/2001PPART
DetailsJim Storey
mike ###-#### handrail returns/riser height at landing. 3/2/2001 4:19:20 PM
FIRE-Final Inspection2/5/20012/6/20012/6/2001PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/5/2001 2:26:14 PM
FIRE-Final Inspection2/5/20012/5/20012/5/2001PNR
DetailsRick Jackson
frank-- ###-#### fire fn frank called and said he wasn't ready 2/5/2001 2:27:02 PM
BLD-Energy code compliance11/6/200011/7/200011/7/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/06/2000 at 15:45:52. Contact: ###-####. 3rd floor ok for cover 2nd and first ok to insulate. 11/7/2000 11:49:45 AM
BLD-Energy code compliance10/25/200010/26/200010/26/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 14:15:29. Contact: ###-####.
BLD-Energy code compliance10/25/200010/26/200010/26/2000PCANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 10/25/2000 at 16:33:43. Contact: ###-####. inspector 301 took 10/26/2000 2:45:45 PM
BLD-Energy code compliance10/25/200010/26/200010/26/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 16:33:43. Contact: ###-####.
BLD-Energy code compliance10/21/200010/25/200010/25/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/21/2000 at 06:53:37. Contact: ###-####. struc. straps in garage at plm. bolts in garge/ fire stop floor chase west unit. 10/25/2000 4:47:14 PM
BLD-Energy code compliance10/20/200010/20/200010/20/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/20/2000 at 07:50:08. Contact: ###-####. 2 nd floor ok 10/20/2000 4:58:59 PM
BLD-Energy code compliance10/16/200010/16/200010/16/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 07:26:09. Contact: ###-####.
BLD-Framing/Rough-in10/16/200010/16/200010/16/2000ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/16/2000 at 07:26:50. Contact: ###-####. fire stooping not comp,et/ two gyp blow patches/ occ gyp behind tub encloser 10/16/2000 11:04:12 AM
BLD-Energy code compliance10/12/200010/13/200010/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/12/2000 at 09:49:40. Contact: ###-####. third floor only ok 10/13/2000 5:15:27 PM
BLD-Framing/Rough-in10/9/200010/10/200010/10/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/09/2000 at 16:10:01. Contact: ###-####. third floor roof framing ok only. 10/10/2000 1:33:47 PM
BLD-Framing/Rough-in1/11/20001/12/20001/12/2000AFAIL
DetailsJim Storey
underground --shilo--- ###-####. Sprinkler r/I inspection for underground.
FIRE-Supply Line Cover12/31/19991/3/20001/3/2000ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/31/1999 at 15:53:39. Contact: ###-####. cancel per ann. Contractor will reschedule.
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS
DetailsRick Jackson