INSP - Final | 8/31/1999 | 9/1/1999 | 9/1/1999 | A | PASS |
Tom Arcoraci
|
|
|
09/01/99 408 - BRAD ###-#### REINSPECTION
|
INSP - Final | 8/30/1999 | 8/31/1999 | 8/31/1999 | A | FAIL |
Alan Hauser
|
|
|
08/31/99 350 - Brad ###-#### late am inspection
|
INSP - Final | 8/30/1999 | 8/30/1999 | 8/30/1999 | | FAIL |
Jim Sly
|
|
|
/ / 316 - VERBAL CORR WITH BUILDER....WILL CALL BACK IN
|
INSP - Final | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
Dixie Fellows
|
|
|
BRAD ###-####, LATE MORNING JIM S WILL DO THIS
|
INSP - Final | 8/26/1999 | 8/27/1999 | 8/27/1999 | P | CANC |
Jim Sly
|
|
|
BRAD ###-####
|
INSP - Energy code compliance | 7/28/1999 | 7/28/1999 | 7/28/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | PASS |
Jim Sly
|
|
|
07/27/99 316 -
|
INSP - Framing/Rough-in | 7/21/1999 | 7/22/1999 | 7/22/1999 | P | FAIL |
Jim Sly
|
|
|
07/22/99 316 - C/N...Misc corr
|
INSP - Framing/Rough-in | 7/14/1999 | 7/14/1999 | 7/14/1999 | | PART |
Tom Arcoraci
|
|
|
/ / 408 - ok to side
|
INSP - Foundation | 6/29/1999 | 6/30/1999 | 6/30/1999 | P | PART |
Jim Sly
|
|
|
06/30/99 316 - Footing, rebar, soil, OK....
|