BLD-Final | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | PASS |
Carl Dependahl
|
|
|
###-#### CLAY
|
Permanent Occupancy | | 10/24/2000 | 10/24/2000 | | DONE |
|
|
|
|
BLD-Final | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | CANC |
Jim Storey
|
|
|
###-#### call first 340. 7/31/2000 1:46:27 PM
|
BLD-Final | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | PASS |
Joe Tawney
|
|
|
Reinsp. ok for perm. occ.
|
FIRE-Final Inspection | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
Joe Tawney
|
|
|
Final fail C/N issued. 5/5/00 10:24:33 AM
|
BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PART |
Carl Dependahl
|
|
|
Clay ###-#### Draft stop ok.
|
BLD-Framing/Rough-in | 10/13/1999 | 10/14/1999 | 10/14/1999 | A | PART |
Carl Dependahl
|
|
|
Clay ###-#### draft stop Draft stop only ok- crossed off on ok to cover sticker
|
BLD-Framing/Rough-in | 10/8/1999 | 10/8/1999 | 10/8/1999 | P | PART |
Tom Arcoraci
|
|
|
shear bolts Clay ###-#### need draftstops @ voids along entry and attic ok to cover walls. T/I only
|
BLD-Framing/Rough-in | 10/5/1999 | 10/6/1999 | 10/6/1999 | A | FAIL |
Carl Dependahl
|
|
|
CLAY-- ###-#### FR INSP c/n: ancor bolts, hold downs, shear panel ok to insulate
|
BLD-Framing/Rough-in | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | FAIL |
Carl Dependahl
|
|
|
###-#### keep c/n
|
BLD-Framing/Rough-in | 9/20/1999 | 9/21/1999 | 9/21/1999 | P | PART |
Carl Dependahl
|
|
|
wayne ###-#### W.I.P.; Gyp install, complete soffits
|
INSP - Framing/Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PART |
Carl Dependahl
|
|
|
"SW1" ok ... ok to begin ext. gypsum
|
INSP - Framing/Rough-in | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | FAIL |
Carl Dependahl
|
|
|
08/20/99 340 - ###-####-clay ---shear nail insp; c/n, need 3" oc at sw 1
|