BLD-Final | 10/19/1999 | 10/20/1999 | 10/22/1999 | P | PASS |
|
|
|
made k signed the card issued l/cScheduled by a contractor via Hello! on 10/19/1999 at 15:24:59. Contact: ###-####.
|
FIRE-Final Inspection | 10/11/1999 | 10/12/1999 | 10/12/1999 | P | PASS |
Rick Jackson
|
|
|
Tim ###-#### Occupancy approved
|
FIRE-Final Inspection | 10/5/1999 | 10/6/1999 | 10/6/1999 | P | FAIL |
Rick Jackson
|
|
|
Tim Hendrix ###-#### alarm panel not ready to test
|
INSP-Final Inspection | 8/24/1999 | 8/25/1999 | 8/25/1999 | P | FAIL |
Rick Jackson
|
|
|
TIM ###-####. detectors needed for roll up doors; alarm plans
|
INSP - Framing/Rough-in | 7/22/1999 | 7/26/1999 | 7/27/1999 | A | FAIL |
|
|
|
07/27/99 338 - penetrations of the rated corridor wall
|