BLD-Final | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PASS |
Russ Owen
|
|
|
ok perm oc. 1/21/2002 1:39:14 PM
|
Permanent Occupancy | | 6/21/2001 | 6/21/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 6/20/2001 1:41:10 PM
|
FIRE-Final Inspection | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | FAIL |
Joe Tawney
|
|
|
Reinsp Damper test OK except it activated spklr bell. Also need spklr system annual test and insp 6/12/2001 12:34:54 PM
|
BLD-Final | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | FAIL |
Carl Dependahl
|
|
|
c/n; damper at corr, other finals...ok for t/o
|
FIRE-Final Inspection | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 08:59:26. Contact: ###-####. Cont. trying to schedule structural final
|
FIRE-Final Inspection | 9/20/1999 | 9/20/1999 | 9/20/1999 | P | PART |
Joe Tawney
|
|
|
2:00 as per tracy and joe / ###-#### ok for temp. occ. S/F damper & detector in rated corridor
|
INSP - Framing/Rough-in | 9/8/1999 | 9/8/1999 | 9/8/1999 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/08/1999 at 06:47:10. Contact: ###-####; 9/8 Walls ok. jrb
|
INSP - Framing/Rough-in | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PART |
Carl Dependahl
|
|
|
09/02/99 340 - OK TO 1SIDE AT CORR.& FURRED AREASScheduled by Hello!. C
|