BLD-Final | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Jim Sly
|
|
|
Bill ###-####. C/C #16031.
|
BLD-Framing/Rough-in | 10/5/1999 | 10/6/1999 | 10/6/1999 | A | PART |
Jim Sly
|
|
|
cindy ###-#### ok to cover add energy code pass
|
BLD-Framing/Rough-in | 10/4/1999 | 10/4/1999 | 10/4/1999 | P | PASS |
Tom Arcoraci
|
|
|
Cindy ###-#### ok to insulate
|
BLD-Framing/Rough-in | 9/28/1999 | 9/29/1999 | 9/29/1999 | P | NR |
Russ Owen
|
|
|
BILL ###-#### FR INSP Need prior inspection notice completed before frame inspection
|
BLD-Framing/Rough-in | 9/24/1999 | 9/24/1999 | 9/24/1999 | P | FAIL |
Tom Arcoraci
|
|
|
MIKE-- ###-####- RE-INSP SHEAR WALL INSP Ok to partial side, see C/notice
|
INSP - Framing/Rough-in | 9/10/1999 | 9/10/1999 | 9/10/1999 | P | FAIL |
Tom Arcoraci
|
|
|
no plans
|
INSP - Framing/Rough-in | 9/7/1999 | 9/7/1999 | 9/7/1999 | P | FAIL |
Jim Sly
|
|
|
bill ###-#### nailing insp; 9/7 C/N installed windows in shear panels. jrb
|
INSP - Foundation | 8/11/1999 | 8/11/1999 | 8/11/1999 | P | PART |
Jim Sly
|
|
|
08/11/99 316 - Foot and rebar appear OK
|