BLD-Final | 11/3/2000 | 11/3/2000 | 11/3/2000 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/3/2000
|
BLD-Framing/Rough-in | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | FAIL |
Jim Storey
|
|
|
###-#### C/N firewall / mech insp. 3/17/00 10:30:04 AM
|
BLD-Framing/Rough-in | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | PASS |
Jim Storey
|
|
|
###-#### Fire wall ok 2nd floor. 3/14/00 11:52:50 AM
|
BLD-Framing/Rough-in | 1/13/2000 | 1/13/2000 | 1/14/2000 | P | CANC |
Jim Storey
|
|
|
sheer Ken Jensen ###-####
|
BLD-Framing/Rough-in | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | FAIL |
Jim Storey
|
|
|
sheer nail\###-#### dwight
|
BLD-Framing/Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | PART |
Russ Owen
|
|
|
late am brad ###-#### Upper floor firewall.
|
BLD-Framing/Rough-in | 12/17/1999 | 12/17/1999 | 12/17/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 08:34:48. Contact: ###-####. Sheer ok exterior 2nd structure. test
|
BLD-Framing/Rough-in | 12/14/1999 | 12/14/1999 | 12/14/1999 | P | PART |
Jim Storey
|
|
|
brad ###-#### fr 1st floor fire wall ok gyp. Wall.
|
BLD-Footing | 12/2/1999 | 12/2/1999 | 12/2/1999 | A | PART |
Jim Storey
|
|
|
P/WO insp set backs ok.
|
BLD-Footing | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | NR |
Carl Dependahl
|
|
|
###-#### 2:30 ready Gave to Storey.
|