BLD-Final | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PASS |
Jim Storey
|
|
|
ELECTRICAL IS GOING OUT AM MONDAY ###-#### L/C ok.
|
BLD-Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
Jim Storey
|
|
|
was a fire final contact # ###-#### no name ivr special C/N posted.
|
FIRE-Final Inspection | 11/18/1999 | 11/19/1999 | 11/18/1999 | A | CANC |
Rick Jackson
|
|
|
was to be a str finalScheduled by a contractor via Hello! on 11/18/1999 at 11:51:03. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/9/1999 | 11/10/1999 | 11/15/1999 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 18:03:03. Contact: ###-####. Frame ok.
|
BLD-Framing/Rough-in | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 13:33:22. Contact: ###-####.
|
INSP - Framing/Rough-in | 8/12/1999 | 8/13/1999 | 8/13/1999 | A | NR |
Jim Storey
|
|
|
08/13/99 301 - pending ele , plm
|
INSP - Framing/Rough-in | 7/19/1999 | 7/19/1999 | 7/19/1999 | P | NR |
Jim Storey
|
|
|
07/19/99 301 - need ele rough in insp.
|