BLD-Final | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PASS |
Carl Dependahl
|
|
|
This is the one we talked about., ok to sign at office for c/o, corrections ok 1/29/2001 11:17:24 AM
|
Permanent Occupancy | | 1/29/2001 | 1/29/2001 | | DONE |
|
|
|
|
BLD-Conference | 10/30/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/30/2000 w/ dave at site
|
BLD-Conference | 10/30/2000 | 10/30/2000 | 10/30/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/30/2000 w/Dave re final
|
BLD-Final | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/27/2000 at 13:53:48. Contact: ###-####.
|
BLD-Other | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 10:14:45. Contact: ###-####.
|
FIRE-Final Inspection | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Joe Tawney
|
|
|
temp occ Mike ###-#### OK for permanant occupancy 9/15/2000 12:12:46 PM
|
FIRE-Final Inspection | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | FAIL |
Joe Tawney
|
|
|
Mike ###-#### Final Fail Fire Ext and FD access 9/15/2000 7:45:32 AM
|
BLD-Framing/Rough-in | 7/31/2000 | 7/31/2000 | 7/31/2000 | P | PART |
Carl Dependahl
|
|
|
mike ###-####-- dry wall insp..fasten perimeters as 7/31/2000 5:06:18 PM r 7/31/2000 5:06:19 PM
|
BLD-Framing/Rough-in | 7/27/2000 | 7/27/2000 | 7/27/2000 | P | CANC |
Jim Storey
|
|
|
nailing Mike ###-#### dry wall trans to 340. 7/31/2000 1:45:13 PM
|
BLD-Framing/Rough-in | 7/26/2000 | 7/27/2000 | 7/26/2000 | A | PART |
Carl Dependahl
|
|
|
mike ###-####
|
BLD-Framing/Rough-in | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/26/2000 ok to insul. only. 7/26/2000 5:43:25 PM
|
BLD-Energy code compliance | 7/20/2000 | 7/24/2000 | 7/24/2000 | A | PART |
Carl Dependahl
|
|
|
Mike ###-####; ok to cover 2nd fl. lid, need detail clarified for r.c. at 1st fl 7/24/2000 10:32:51 AM
|
BLD-Conference | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PASS |
Carl Dependahl
|
|
|
W/architect re: 1hr. req's keep C/N
|
BLD-Framing/Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### gable on clubhouse 2nd C/N, roof vents, other C/N. 7/13/00 11:26:59 AM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | FAIL |
Carl Dependahl
|
|
|
Mike ###-#### Keep C/N- recall 7/12/00 10:32:50 AM
|
BLD-Framing/Rough-in | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | FAIL |
Carl Dependahl
|
|
|
Mike ###-#### C/N firestops, blockes, etc. Partial only. 7/10/00 10:27:41 AM
|
BLD-Framing/Rough-in | 6/16/2000 | 6/16/2000 | 6/16/2000 | P | PART |
Tom Arcoraci
|
|
|
SHEET ROCK ON SOFFIT mIKE ###-#### dry wal on soffia 6/19/00 2:01:23 PM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | FAIL |
Jim Sly
|
|
|
exterior sheet rock on soffit Mike ###-####
|
BLD-Framing/Rough-in | 5/16/2000 | 5/17/2000 | 5/17/2000 | A | PART |
Carl Dependahl
|
|
|
exterior sheet rock wall also a conference Mike ###-#### Conf w/ arch, resubmit Wattsun for each unit. 5/18/00 3:02:14 PM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### 2nd fl. ext. gyp. ok; need verify H-D's @ rear wall..retro fit. 5/15/00 11:06:29 AM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Ext. shear walls- tighten nailing to 4" occ. 5/8/00 9:38:06 AM
|
BLD-Framing/Rough-in | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
Tom Arcoraci
|
|
|
mike ###-#### r/i-pony wall Check at next insp. 5/3/00 3:37:58 PM
|
BLD-Foundation | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### 10:30 - 11:00
|
BLD-Footing | 4/25/2000 | 4/25/2000 | 4/25/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 06:13:16. Contact: ###-####. Bldg. A-1, ftg. ok to pour met w/cont. onsite (V-1 Bldg.) 4/26/00 11:21:54 AM
|