BLD-Final | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/27/2000 at 11:57:07. Contact: ###-####. required signatures not complete. 11/28/2000 10:38:38 AM
|
BLD-Final | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 10:14:41. Contact: ###-####. final only after plumbing is finaled 11/28/2000 5:58:12 PM
|
BLD-Grading Inspection | 12/1/2000 | 12/1/2000 | 11/22/2000 | | PASS |
Rita DeYoung
|
|
|
Grading approved on 11/22/00. Signed occupancy card
|
BLD-Final | 11/20/2000 | 11/22/2000 | 11/22/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/20/2000 at 11:21:33. Contact: ###-####. 10 idem c/n on site. 11/22/2000 9:57:49 AM
|
BLD-Final | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 18:20:46. Contact: ###-####.
|
BLD-Final | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 10:46:07. Contact: ###-####.
c/n posted, no access,,, Terry Records sign off,,, no inspection made 11/17/2000 4:26:22 PM
|
FIRE-Final Inspection | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | PASS |
Joe Tawney
|
|
|
###-####. Final OK for permanant occupancy 11/17/2000 8:00:08 AM
|
BLD-Energy code compliance | 2/15/2000 | 2/15/2000 | 2/7/2000 | P | PASS |
Wes Worcester
|
|
|
Ok for cover.
|
BLD-Framing/Rough-in | 2/15/2000 | 2/15/2000 | 2/7/2000 | P | PASS |
Wes Worcester
|
|
|
CN made ok.
|
BLD-Framing/Rough-in | 1/27/2000 | 1/27/2000 | 1/26/2000 | P | PART |
Wes Worcester
|
|
|
CN issued on framing, ok to begin insulation.
|
BLD-Framing/Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 08:50:48. Contact: ###-####. No address #'s- no approved plan engineered fix covered w/siding (shear) truss engineering & TSI specs not done. 1/25/00 1:30:09 PM
|
BLD-Wall cover | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 08:51:50. Contact: ###-####. covered w/siding- remove for inspection. 1/25/00 1:30:26 PM
|
BLD-Framing/Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | FAIL |
Wes Worcester
|
|
|
sheer wall Chris Connor ###-####. Engineering fix not done at this time- several seams not stapled off- no conversion chart for type of staple used and schedule.
|
BLD-Wall cover | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 12:03:19. Contact: ###-####.--per wes will do pm C/N not done.
|
BLD-Other | 12/17/1999 | 12/20/1999 | 12/20/1999 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/17/1999 at 17:01:05. Contact: ###-####. Need engineer to address corrections, hold-downs etc., posted correction on front wall, DO NOT COVER..
|
BLD-Wall cover | 12/18/1999 | 12/20/1999 | 12/20/1999 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/18/1999 at 17:52:14. Contact: ###-####. See notes under same day this was duplicated.
|
BLD-Foundation | 9/29/1999 | 9/29/1999 | 9/29/1999 | A | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 09/29/1999 at 06:34:26. Contact: ###-####.
|
BLD-Footing | 9/28/1999 | 9/28/1999 | 9/28/1999 | A | PASS |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 09/28/1999 at 05:45:32. Contact: ###-####.
|
BLD-Footing | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | FAIL |
Wes Worcester
|
|
|
dean--- ###-#### ft insp Not ready
|