BLD-Final | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/27/2000 at 10:15:05. Contact: ###-####. c\c # 17253 1/28/00 12:51:30 PM
|
BLD-Final | 1/20/2000 | 1/20/2000 | 1/20/2000 | A | FAIL |
Jim Sly
|
|
|
C/N.. need perimeter insul.
|
BLD-Energy code compliance | 11/18/1999 | 11/18/1999 | 11/18/1999 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/18/1999 | 11/18/1999 | 11/18/1999 | P | PASS |
Jim Sly
|
|
|
Larry ###-####
|
BLD-Framing/Rough-in | 11/15/1999 | 11/15/1999 | 11/15/1999 | P | FAIL |
Jim Sly
|
|
|
LARRY ###-#### FR INSP C/N.. Install retros per MFG, verify bearing 3 ply, need mech. Approval.
|
BLD-Framing/Rough-in | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | PART |
Jim Sly
|
|
|
LARRY --###-#### SHEAR PANEL INSP Shear wall ok
|
INSP - Concrete | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Jim Sly
|
|
|
08/12/99 316 - Stem wall and rebar appears OK
|
INSP - Foundation | 8/9/1999 | 8/10/1999 | 8/10/1999 | P | PART |
Alan Hauser
|
|
|
08/10/99 350 - JED ###-#### 20153 EXT
|