BLD-Framing/Rough-in | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### wrong permit for shear nail ok to side 13300 engelman 12/28/2000 11:04:23 AM
|
BLD-Final | 3/15/2000 | 3/16/2000 | 3/16/2000 | A | PASS |
Jim Sly
|
|
|
###-#### C/C #17341 3/16/00 1:47:07 PM
|
BLD-Energy code compliance | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Tom Arcoraci
|
|
|
todd ###-#### energy code insp
|
BLD-Framing/Rough-in | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 14:14:00. Contact: ###-####. C/N.. Squash blocks, fireblocks, cold air ret. Connected to attic space.
|
BLD-Framing/Rough-in | 10/21/1999 | 10/21/1999 | 10/21/1999 | P | PART |
Jim Sly
|
|
|
todd ###-#### shear wall Shear wall ok
|
INSP - Foundation | 8/13/1999 | 8/16/1999 | 8/16/1999 | A | PASS |
Wes Worcester
|
|
|
08/16/99 342 - BOB ###-#### FOOTING
|
INSP - Foundation | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | PASS |
Wes Worcester
|
|
|
08/12/99 342 - cal ###-#### reinspection footing
|
INSP - Foundation | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | FAIL |
Wes Worcester
|
|
|
08/12/99 342 - FOOTING BOB ###-#### not to plan
|