BLD-Final | 6/15/2000 | 6/16/2000 | 6/16/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/15/2000 at 10:49:09. Contact: ###-####.\\KEY IS WEATHER PROOF ELE OUTLET BEHIND FOAM ON THE SIDE OF GARAGE BY FRONT DOOR.\\PLEASE CALL FIRST ###-#### C/C #18446 6/16/00 2:22:25 PM
|
BLD-Energy code compliance | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PASS |
Jim Sly
|
|
|
REINSPECTION STEVE ###-####
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | P | FAIL |
Tom Arcoraci
|
|
|
call first steve ###-#### See C/Notice
|
BLD-Framing/Rough-in | 10/18/1999 | 10/19/1999 | 10/19/1999 | A | FAIL |
Jim Sly
|
|
|
STEVE ###-#### FR INSP C/N need appr. Plans & truss eng.
|
BLD-Framing/Rough-in | 9/20/1999 | 9/21/1999 | 9/21/1999 | A | PART |
Jim Sly
|
|
|
sheer inspection Shear wall ok
|
INSP - Foundation | 8/3/1999 | 8/4/1999 | 8/4/1999 | A | PASS |
Alan Hauser
|
|
|
08/04/99 350 - AROUND 10:OO IF POSSIBLE STEVE ###-####
|