BLD-Final | 8/22/2000 | 8/22/2000 | 8/22/2000 | P | PASS |
Jim Sly
|
|
|
###-#### lock box EBH
|
BLD-Final | 8/21/2000 | 8/21/2000 | 8/21/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 11:03:38. Contact: ###-####. no access...called 8/21/2000 1:43:12 PM
|
BLD-Energy code compliance | 7/14/2000 | 7/17/2000 | 7/17/2000 | A | PASS |
Alan Hauser
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | PART |
|
|
|
Grey ###-#### energy c/n ok to insulate only 7/13/2000 5:01:14 PM
|
BLD-Framing/Rough-in | 7/3/2000 | 7/5/2000 | 7/5/2000 | A | PART |
Tom Arcoraci
|
|
|
debbie ###-#### shear wall ok to side 7/5/00 2:02:12 PM
|
BLD-Foundation | 6/15/2000 | 6/16/2000 | 6/16/2000 | A | PART |
Alan Hauser
|
|
|
###-#### Done #316 6/16/00 2:22:18 PM
|
BLD-Footing | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | PART |
Jim Sly
|
|
|
###-#### darren F/P not shown on appr. plot plan contr. notified. 6/16/00 8:54:29 AM
|