Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02327
StatusFinaled
Name BOISEAN JOINT VENTURE
Site Address 2249 W UNIVERSITY DR
Project NameOFFICE DEPOT
Customer Number 
ePlanReviewNo
Description
OFFICE DEPOT * TO CONSTRUCT A NEW 25,330 SQUARE FOOT, ONE STORY OFFICE SUPPLY RETAIL STORE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE FOUNDATION AND SLAB FLOOR, MASONRY EXTERIOR WALLS, STEEL FRAME AND STEEL ROOF JOIST WITH METAL ROOF DECK. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. DRH99-0123/CUP99-0064/PC#607-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20004/27/20004/27/2000PPASS
DetailsJim Storey
Office Depot
Permanent Occupancy 4/27/20004/27/2000 DONE
Details
BLD-Final4/25/20004/26/20004/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/25/2000 at 14:54:44. Contact: ###-####. temp occ. ok pending others. 4/26/00 8:30:25 AM
BLD-Final4/17/20004/18/20004/18/2000ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/17/2000 at 16:04:53. Contact: ###-####.
FIRE-Final Inspection4/13/20004/17/20004/17/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/13/2000 at 12:08:10. Contact: ###-####.
BLD-Final4/12/20004/13/20004/13/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/12/2000 at 18:02:52. Contact: ###-####.
FIRE-Conference3/23/20003/23/20003/22/2000PPART
DetailsRick Jackson
discussed alarm plans - wil change 15/75/ cd strobes to 110. will use lower ma rating strobes and will provide adjusted battery calcs.
BLD-Framing/Rough-in3/8/20003/8/20003/8/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/08/2000 at 10:27:35. Contact: ###-####. Ceiling ok. 3/9/00 9:07:27 AM
BLD-Framing/Rough-in2/15/20002/16/20002/16/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/15/2000 at 14:51:36. Contact: ###-####. Ceiling grid C/N posted. 2/17/00 8:54:54 AM
FIRE-Supply Line Flush1/24/20001/25/20001/25/2000APASS
DetailsRick Jackson
BETWEEN 9 AND 9:30 tRACY ###-#### Flush ok. 1/25/00 1:34:40 PM
BLD-Framing/Rough-in1/12/20001/12/20001/12/2000PPART
DetailsJim Storey
framing ok pending ele insp.
FIRE-Supply Line Cover1/10/20001/10/20001/10/2000PPART
DetailsRick Jackson
rough-in inspection - okay to cover hard lid areas
BLD-Framing/Rough-in12/14/199912/15/199912/15/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/1999 at 16:30:40. Contact: ###-####. Roof deck & roof materials ok pending final report for welding of special insp.
BLD-Framing/Rough-in12/9/199912/10/199912/10/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/09/1999 at 15:07:01. Contact: ###-####. Work in progress roof deck welding and button punching
BLD-Framing/Rough-in11/30/199912/1/199912/1/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/1999 at 14:04:47. Contact: ###-####. Placed masonary grout w/special insp. Pending report.
BLD-Framing/Rough-in11/30/199912/1/199912/1/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/30/1999 at 14:05:53. Contact: ###-####. Rebar & weld plates ok pending report for grout.
BLD-Framing/Rough-in11/26/199911/30/199911/30/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/26/1999 at 11:34:07. Contact: ###-####. Pend special insp. Report.
BLD-Framing/Rough-in11/26/199911/30/199911/30/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/26/1999 at 11:34:41. Contact: ###-####. Placed w/special insp. Massonary grout report pending.
BLD-Framing/Rough-in11/26/199911/29/199911/29/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/26/1999 at 11:30:36. Contact: ###-####. Covered under spec. insp. Pend. Report.
BLD-Framing/Rough-in11/26/199911/29/199911/29/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/26/1999 at 11:33:08. Contact: ###-####. Special insp. Pending report.
BLD-Framing/Rough-in11/23/199911/24/199911/24/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/23/1999 at 08:05:33. Contact: ###-####. Pending sp. Insp. Report.
BLD-Framing/Rough-in11/23/199911/24/199911/24/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/23/1999 at 08:06:27. Contact: ###-####. Pend report.
BLD-Framing/Rough-in11/23/199911/23/199911/23/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/23/1999 at 08:04:43. Contact: ###-####. Pend. Report S.I.
BLD-Framing/Rough-in11/18/199911/22/199911/22/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/18/1999 at 16:02:28. Contact: ###-####. Pend S.I. Report.
BLD-Framing/Rough-in11/18/199911/22/199911/22/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/18/1999 at 16:03:19. Contact: ###-####. Pend. S I report.
BLD-Framing/Rough-in11/18/199911/19/199911/19/1999APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/18/1999 at 16:00:55. Contact: ###-####.
BLD-Framing/Rough-in11/18/199911/19/199911/19/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/18/1999 at 16:01:40. Contact: ###-####. Placed w/special insp. Pending report.
BLD-Framing/Rough-in11/17/199911/18/199911/18/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/17/1999 at 17:02:33. Contact: ###-####.
BLD-Framing/Rough-in11/17/199911/18/199911/18/1999PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/17/1999 at 17:03:25. Contact: ###-####.
BLD-Framing/Rough-in11/16/199911/17/199911/17/1999ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/1999 at 16:53:41. Contact: ###-####. Rained out.
BLD-Framing/Rough-in11/16/199911/17/199911/17/1999PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/16/1999 at 16:54:32. Contact: ###-####. Rained out.
FIRE-Sprinkler Rough-in11/15/199911/16/199911/16/1999APASS
DetailsRick Jackson
TRACY ###-#### R/I Underground supply line-hydro ok.
BLD-Framing/Rough-in11/12/199911/15/199911/15/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/12/1999 at 09:01:16. Contact: ###-####. Covered w/S/I pend report.
BLD-Framing/Rough-in11/12/199911/12/199911/12/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/12/1999 at 09:00:10. Contact: ###-####. Covered by special inspection pend. Report.
BLD-Foundation11/8/199911/9/199911/9/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/08/1999 at 13:32:58. Contact: ###-####. 1st 48' lift placed w/special insp. Pending report.
BLD-Footing10/27/199910/28/199910/28/1999PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/27/1999 at 19:19:58. Contact: ###-####. Foundation ok
BLD-Foundation10/27/199910/28/199910/28/1999PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/27/1999 at 19:20:40. Contact: ###-####. Foundation ok
FIRE-Supply Line Cover10/22/199910/22/199910/22/1999PPASS
DetailsRick Jackson
TRACY ###-#### AROUND 4:00 AS PER RICK Underground okay to cover- Thrust block installed at base of river.
BLD-Footing10/21/199910/21/199910/21/1999PPART
DetailsJim Storey
TONY ###-####
BLD-Foundation10/18/199910/20/199910/20/1999APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/1999 at 16:11:17. Contact: ###-####. Placed w/special insp. Pend. Report
BLD-Foundation10/18/199910/19/199910/18/1999PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/1999 at 10:18:09. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/18/1999 at 16:09:49.
BLD-Foundation10/15/199910/15/199910/15/1999PPART
Details
Scheduled by a contractor via Hello! on 10/15/1999 at 08:59:03. Contact: ###-####. Found walls at east/south west and loading rock area
BLD-Footing10/13/199910/14/199910/14/1999PPART
Details
Scheduled by a contractor via Hello! on 10/13/1999 at 14:18:05. Contact: ###-####. Footings/step footing at dock area- sp. Insp. Darren- 2.5" slump- water displaced
BLD-Foundation10/13/199910/14/199910/14/1999PPART
Details
Scheduled by a contractor via Hello! on 10/13/1999 at 14:19:30. Contact: ###-####. Ok to pour, ok to wet set #5 dowells- east wall
BLD-Footing10/11/199910/12/199910/12/1999PPART
DetailsJim Storey
pending special inspection reportScheduled by a contractor via Hello! on 10/11/1999 at 16:46:18. Contact: ###-####.
BLD-Foundation10/11/199910/12/199910/12/1999PPART
DetailsJim Storey
pending special insp reportScheduled by a contractor via Hello! on 10/11/1999 at 16:45:31. Contact: ###-####.
BLD-Footing10/11/199910/11/199910/11/1999PPART
Details
Tony ###-#### MTI to provide scope of work. Arch to resubmit 8" wall before insp.