BLD-Final | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 07:35:07. Contact: ###-####. L/C ok.
|
BLD-Final | 12/20/1999 | 12/20/1999 | 12/20/1999 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 08:13:32. Contact: ###-####. C/N.
|
BLD-Energy code compliance | 11/19/1999 | 11/22/1999 | 11/22/1999 | A | PASS |
Jim Storey
|
|
|
PAT ###-#### ENERGY CODE INSP Need to check draft stop at final.
|
BLD-Framing/Rough-in | 11/19/1999 | 11/19/1999 | 11/19/1999 | P | PASS |
Jim Storey
|
|
|
JOE ###-#### REINSPECTION Frame ok.
|
BLD-Framing/Rough-in | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | FAIL |
Jim Storey
|
|
|
PAT ###-#### FR INSP Not per plan fire wall/ mech. Gas only no R/I/ will not meet Boise Energy Code, no energy aduit supplied.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/9/1999 | 11/10/1999 | A | PART |
Jim Storey
|
|
|
pat--###-#### shear wall insp Shear nailing or only.
|
BLD-Footing | 10/12/1999 | 10/12/1999 | 10/12/1999 | P | PART |
|
|
|
Pat Palmer ###-#### R-Bar placed ok to pour.
|