Permit Information
Permit NumberBLD99-02344
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC BLDG5(TA2)MATLAB
Customer Number05-992710
ePlanReviewNo
Description
BUILDING 05 - (TA2) MATERIAL ANALYSIS LAB (05-992710) * DEMOLISH AND REMOVE SOME EXISTING PARTITIONS, DOORS, CEILING TILES AND MECHANICAL DUCT WORK, AS WELL AS SAW, CUT EXISTING CONCRETE SLAB FLOOR. TO EXCAVATE AND POUR NEW CONCRETE RETAINING WALLS AND SLAB FLOOR, INSTALL NEW ACCESS FLOOR SYSTEM, INTERIOR PARTITIONS, DOORS, HEPA FILTER AND CEILING GRID AND MECHANICAL EQUIPMENT TO CREATE A NEW 1380 SQ. FT. MATERIAL ANALYSIS LAB AREA. THIS WORK IS BEING DONE ON THE EAST SIDE OF THE FIRST FLOOR OF BUILDING #5, BETWEEN GRID LINES 9&10 AND B&D. ALL CONSTRUCTION PER THE APPROVED PLANS AND RELINED NOTES. PC #617-99/JCM Intial value $620,000 Electrical value $65000 Plumbing $4000 Mechincal $300000 Fire Sprinkler $5000
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20003/17/20003/17/2000APASS
DetailsJim Storey
Final ok.
FIRE-Final Inspection2/25/20002/28/20002/29/2000PPASS
DetailsRick Jackson
tony ###-#### fire fn
BLD-Final2/7/20002/8/20002/8/2000PPART
DetailsJim Storey
Ernie ###-#### pend fire sign off
BLD-Final1/19/20001/20/20001/20/2000AFAIL
DetailsJim Storey
###-#### Pending fire insp. 1/20/00 4:15:26 PM
BLD-Final1/12/20001/13/20001/13/2000PFAIL
DetailsJim Storey
###-#### CURT
BLD-Final12/14/199912/15/199912/15/1999AFAIL
DetailsJim Storey
###-#### 2 hr wall penetration.
FIRE-Final Inspection12/14/199912/15/199912/15/1999AFAIL
DetailsRick Jackson
###-#### Alarms not complete.
FIRE-Final Inspection12/9/199912/10/199912/10/1999ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/09/1999 at 16:29:45. Contact: . Will reschedule