BLD-Framing/Rough-in | 9/29/1999 | 9/29/1999 | 9/29/1999 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/29/1999 at 08:12:33. Contact: ###-####. OK to sheetrock
|
BLD-Framing/Rough-in | 9/27/1999 | 9/28/1999 | 9/28/1999 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 22:02:11. Contact: ###-####. OK to insulate after Mec. R/I is ok
|
BLD-Framing/Rough-in | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | PART |
Jim Sly
|
|
|
C/N - COMPLETE INSTALLATION OF RETRO FIT HOLD DOWN - OK TO SIDE
|
INSP - Framing/Rough-in | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | PART |
Tom Arcoraci
|
|
|
OK TO SIDE, SEE C/N
|
INSP - Framing/Rough-in | 9/14/1999 | 9/14/1999 | 9/14/1999 | P | FAIL |
Jim Sly
|
|
|
C/N . NAIL SHEAR PANELS PER ENGINEERING
|
INSP - Framing/Rough-in | 9/14/1999 | 9/14/1999 | 9/14/1999 | P | PART |
Tom Arcoraci
|
|
|
DONE BY 316
|
INSP - Framing/Rough-in | 9/7/1999 | 9/7/1999 | 9/7/1999 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/07/1999 at 07:04:10. Contact: ###-####; 9/7 verification of footing (pad) for point load (garage) jrb;
|
INSP - Foundation | 8/17/1999 | 8/17/1999 | 8/17/1999 | P | PASS |
Jim Sly
|
|
|
08/17/99 316 - Stem wall and rebar
|
INSP - Framing/Rough-in | 8/16/1999 | 8/17/1999 | 8/17/1999 | A | NR |
Jim Sly
|
|
|
08/17/99 316 - NR
|
INSP - Foundation | 8/12/1999 | 8/13/1999 | 8/13/1999 | A | FAIL |
Alan Hauser
|
|
|
08/13/99 350 - poured without inspection
|