BLD-Final | 12/2/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 15:52:11. Contact: ###-####. C/C #17211.
|
BLD-Final | 12/1/1999 | 12/2/1999 | 12/2/1999 | P | FAIL |
Jim Sly
|
|
|
allen-- ###-#### fn insp--access on gar door 1999 enter C/N.. Seal 1 hr. wall @ duct.
|
BLD-Energy code compliance | 10/15/1999 | 10/18/1999 | 10/18/1999 | A | PASS |
Jim Sly
|
|
|
allen ###-#### energy code insp
|
BLD-Framing/Rough-in | 10/15/1999 | 10/18/1999 | 10/18/1999 | A | PASS |
Jim Sly
|
|
|
allen ###-#### re-insp fr insp
|
BLD-Framing/Rough-in | 10/12/1999 | 10/13/1999 | 10/13/1999 | P | FAIL |
Jim Sly
|
|
|
Alan ###-#### C/N need electr. R/I & misc. corr.
|
BLD-Framing/Rough-in | 10/8/1999 | 10/12/1999 | 10/12/1999 | P | FAIL |
Jim Sly
|
|
|
Alan ###-#### c/N.. Need electr., mech., R/I approvals, and air infiltration
|
BLD-Framing/Rough-in | 10/1/1999 | 10/4/1999 | 10/4/1999 | P | PART |
Jim Sly
|
|
|
SHEAR ###-#### shear wall ok
|
INSP - Foundation | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | NR |
Jim Sly
|
|
|
08/30/99 316 - NR
|
INSP - Foundation | 8/30/1999 | 8/30/1999 | 8/30/1999 | P | PASS |
Jim Sly
|
|
|
08/30/99 316 -
|
INSP - Foundation | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | PART |
Jim Sly
|
|
|
08/27/99 316 - Foot and rebar appears OK per plan
|
INSP - Foundation | 8/26/1999 | 8/7/1999 | 8/7/1999 | A | CANC |
Jim Sly
|
|
|
FOOTING WES ###-#### X 20245. MISKEYED, RESCHEDULED FOR AFT.
|