Permit Information
Permit NumberBLD99-02419
StatusFinaled
Name U OF I (IDAHO URBAN RESEARCH &
Site Address 775 W FULTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To convert a 2,988 sq.ft. warehouse space to drafting studio and conference room per approved plans on file. Work to include an entry lobby and main entry/exit onto Fulton Street with a new wood landing and ramp over ACHD right-of-way. Approval for construction in right-of-way provided by William Schweitzer for ACHD and Lawrence Blake for BSU is approved by Tim Hogland, Boise City PDS Director. THE LICENSE AGREEMENT IS VALID FOR 1 YEAR COMMENCING ON 10/6/99, UNLESS TERMINATED IN ACCORDANCE WITH THE TERMS NOTED IN THE AGREEMENT. OCCUPANCY OF THIS SPACE IS NOT ALLOWED ONCE ACHD LICENSE AGREEMENT IS TERMINATED WITHOUT OTHER APPROVED ACCESS. NOTE: This building is fully fire sprinklered for 1-hr. substitution. (P.C.#642-99) CZC99-0120 (MLO) 6-20-2000 PLAN MODIFICATION APPROVED WHICH DELETES THE EXTERIOR RAMP ON FULTON STREET AND PROVIDES A GLASS STORE FRONT ENTRANCE WITH AN INTERIOR STAIRWAY OFF FULTON STREET. ALL WORK PER APPROVED PLAN MODIFICATION AND ORIGINAL APPROVED PLANS. MLO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  8/12/2003 DONE
BLD-Final7/23/20037/24/20037/24/2003APASS
DetailsCarl Dependahl
Cathy has the card!...signed off by all! 7/23/2003 4:01:20 PM
Permanent Occupancy 7/24/20037/24/2003 DONE
Details
BLD-Final3/14/20033/17/20033/17/2003PNR
DetailsCarl Dependahl
###-#### OR ###-#### SHERRY....still need other ok's ( fire ok ) 3/17/2003 4:35:05 PM
BLD-Final3/11/20033/12/20033/12/2003AFAIL
DetailsCarl Dependahl
issued 5 day N&O & c/n to obtain final 3/12/2003 11:00:54 AM
BLD-Final3/7/20033/11/20033/11/2003ACANC
DetailsCarl Dependahl
per cathy w. 3/10/2003 7:53:19 AM
BLD-Final3/10/20033/11/20033/11/2003ANR
DetailsCarl Dependahl
unable to contact 3/11/2003 6:23:09 PM
BLD-Conference3/15/20023/18/20023/18/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/15/2002 4:01:30 PM unable to contact 3/22/2002 4:09:16 PM
BLD-Final9/7/20009/8/20009/8/2000PPART
Details
Scheduled by a contractor via Hello! on 09/07/2000 at 15:42:08. Contact: ###-####. made ok for temp occ 9/8/2000 1:55:15 PM
BLD-Final9/6/20009/7/20009/7/2000AFAIL
Details
this is for a temp occ : Sherry ###-#### other agencies not approved 9/7/2000 3:12:27 PM
BLD-Final9/5/20009/5/20009/5/2000PFAIL
Details
sherri-- ###-#### fn occ need code enf. and achd signoffs 9/7/2000 3:11:25 PM
BLD-Final8/31/20008/31/20008/31/2000PNR
DetailsJim Storey
Fire is also going out Shelly ###-####
FIRE-Final Inspection8/31/20008/31/20008/31/2000PPASS
DetailsRick Jackson
shelly ###-#### structural is also going out
BLD-Final8/29/20008/30/20008/30/2000PNR
DetailsJim Storey
###-####---SHERI FN OCC need other sign offs. 8/30/2000 5:54:36 PM
BLD-Framing/Rough-in8/22/20008/22/20008/22/2000PPART
Details
fire caulking Liz ###-#### ok for the fire caulking only 8/23/00 8:36:56 AM
BLD-Framing/Rough-in8/22/20008/22/20008/22/2000PPART
Details
fire caulking Liz ###-#### on the fire caulking 8/23/2000 1:42:58 PM
BLD-Final8/16/20008/16/20008/16/2000PPART
Details
med liz after 5:00 on site and went over all req for getting final signoff all drywall was hung still some door hardware adjustments required ...338
FOR THE LOBBY -LIZ YOUNG ###-#### FN----CANC PER LIZ
BLD-Framing/Rough-in8/10/20008/10/20008/10/2000PPART
Details
hardware\\###-#### insp on the door hardwareand the ceiling protection at the prop line at the tracks 8/10/2000 3:15:22 PM
BLD-Framing/Rough-in7/24/20007/25/20007/25/2000APART
Details
###-#### framing under stairway need info on the access panel under exit stairs at fulton 7/25/2000 11:33:27 AM
BLD-Framing/Rough-in7/17/20007/18/20007/18/2000PPART
DetailsRuss Owen
###-#### Lobby only, no wireing on inside 7/19/00 10:05:50 AM