BLD-Conference | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | CANC |
|
|
|
per Perry out of time 6/19/00 6:51:04 AM
|
BLD-Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 12:38:06. Contact: ###-####. after 9:30 am Grading not done at this time, also rear slider has been disabled with a osb barrrier screwewd into ext wall , not a permit will be required for the rear patio deck.
|
BLD-Energy code compliance | 11/8/1999 | 11/8/1999 | 11/8/1999 | P | PASS |
Wes Worcester
|
|
|
late pm eva ###-####
|
BLD-Framing/Rough-in | 11/5/1999 | 11/5/1999 | 11/5/1999 | P | PASS |
Wes Worcester
|
|
|
LATE PM TODAY EVA ###-####
|
BLD-Framing/Rough-in | 10/26/1999 | 10/26/1999 | 10/26/1999 | P | PART |
Wes Worcester
|
|
|
shear inspection eva ###-#### Shear ok
|
BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 | P | NH |
Wes Worcester
|
|
|
homeowner--- kean-- ###-#### fr Renail shear
|
BLD-Framing/Rough-in | 10/6/1999 | 10/7/1999 | 10/7/1999 | A | PART |
Wes Worcester
|
|
|
shear Eva ###-####\shear ok
|
BLD-Other | 10/7/1999 | 10/7/1999 | 10/5/1999 | P | PART |
Bob Archibald
|
|
|
Reviewed requirements for final occupancy. Shed/garage must be appoved as a dwelling or returned to a garage prior to issuance of final on main house.
|
INSP - Foundation | 9/7/1999 | 9/7/1999 | 9/7/1999 | P | PASS |
Wes Worcester
|
|
|
Eva Team ###-####; 9/7 entered pass. jrb
|
INSP - Foundation | 9/3/1999 | 9/3/1999 | 9/3/1999 | | PART |
|
|
|
|
INSP - Concrete | 9/1/1999 | 9/2/1999 | 9/2/1999 | A | PART |
Wes Worcester
|
|
|
09/02/99 342 - Scheduled by Hello!. Contact phone is [8678066].
|
INSP - Concrete | 8/26/1999 | 8/27/1999 | 8/27/1999 | A | PART |
Wes Worcester
|
|
|
08/27/99 342 - Scheduled by Hello!. Contact phone is [8678066]. column
|
INSP - Framing/Rough-in | 8/23/1999 | 8/23/1999 | 8/23/1999 | P | FAIL |
Wes Worcester
|
|
|
08/23/99 342 - stop wk issued, need c/o for garage/storage
|