BLD-Final | 12/21/1999 | 12/22/1999 | 12/22/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 17:40:18. Contact: ###-####. C/C #16033.
|
BLD-Framing/Rough-in | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | PASS |
Tom Arcoraci
|
|
|
GEORGE-- ###-#### FR INSP
|
BLD-Framing/Rough-in | 11/8/1999 | 11/9/1999 | 11/9/1999 | P | CANC |
Jim Sly
|
|
|
GEORGE ###-#### cancelled failed mechanical
|
BLD-Framing/Rough-in | 11/5/1999 | 11/5/1999 | 11/5/1999 | P | FAIL |
Jim Sly
|
|
|
George, ###-#### - after 2:00 : ) C/N.. Fireblocks.
|
BLD-Framing/Rough-in | 11/3/1999 | 11/3/1999 | 11/3/1999 | P | FAIL |
Jim Sly
|
|
|
GEORGE--- ###-#### FR INSP C/N need truss eng. And air infiltration package.
|
BLD-Framing/Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PART |
Jim Sly
|
|
|
GEORGE ###-#### C/N need HD's at each side of front entry marked XXX ok to side
|
BLD-Framing/Rough-in | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | FAIL |
Jim Sly
|
|
|
George ###-#### C/N.. Too many shear corr. To list
|
BLD-Framing/Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Tom Arcoraci
|
|
|
robert ###-#### shear panel insp No plans
|
INSP - Foundation | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | PASS |
Jim Sly
|
|
|
FOOTING & FOUND WALL OK
|
INSP - Foundation | 9/14/1999 | 9/14/1999 | 9/14/1999 | P | FAIL |
Jim Sly
|
|
|
C/N - COMPLETE PREV CORR, PAY $42.00, REINSPEC FEE PRIOR NEXT INSPCTN
|
INSP - Foundation | 9/10/1999 | 9/10/1999 | 9/10/1999 | P | FAIL |
Jim Sly
|
|
|
c/n - working past stop work order, complete prev corr, do not pour wall
|
INSP - Foundation | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | FAIL |
Jim Sly
|
|
|
footing poured w/o inspection - issued a stop work order
|