BLD-Final | 2/20/2002 | 2/20/2002 | 2/20/2002 | | DONE |
|
|
|
Trades finaled and engineering/corrections completed. LC #23071 issued.
|
BLD-Conference | 2/13/2002 | 2/13/2002 | 2/13/2002 | P | PART |
Carl Dependahl
|
|
|
Conference w/realtors and underwriters Susan Dailey@1-###-####. All trades are to be finaled. Stairway to upstairs removed. Engineering stamped letter that modified ceiling is structurally sound. Upon completion of these items a structural inspection can be performed for life safety and P&Z requirements.
|
BLD-Final | 7/31/2001 | 7/31/2001 | 7/31/2001 | | NR |
Carl Dependahl
|
|
|
See if you can final this one. Bond for code upgrade ready to expire. All other trades finaled. 325. 7/31/01 1:59:42 PM...has pending legal action, keep c/n. 8/2/2001 12:16:47 PM
|
BLD-Final | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### Not ready 4/3/00 1:27:38 PM
|
BLD-Final | 3/30/2000 | 3/31/2000 | 3/31/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### C/N; handrails..no plan, may need beam calc's. 3/31/00 2:13:52 PM
|
INSP - Foundation | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | PART |
Wes Worcester
|
|
|
08/20/99 342 - shawn ###-#### ft insp SETBACKS OK
|