BLD-Final | 11/17/1999 | 11/17/1999 | 11/17/1999 | P | PASS |
Jim Sly
|
|
|
GARY ###-#### FN OCC C/C #16050.
|
FIRE-Final Inspection | 11/16/1999 | 11/17/1999 | 11/17/1999 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 16:00:08. Contact: ###-####. NEEDED TO BE STRUCTURAL-PER GARY SCHAFFNER
|
BLD-Energy code compliance | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/21/1999 at 09:20:47. Contact: ###-####. (add framing insp.. Ok)
|
BLD-Framing/Rough-in | 9/21/1999 | 9/21/1999 | 9/21/1999 | P | PASS |
Jim Sly
|
|
|
|
INSP - Wall cover | 9/14/1999 | 9/15/1999 | 9/15/1999 | A | PASS |
Jim Sly
|
|
|
|
INSP - Foundation | 8/27/1999 | 8/27/1999 | 8/27/1999 | P | |
Jack Frank
|
|
|
FOUNDATION WALL. ###-#### JERRY
|
INSP - Foundation | 8/24/1999 | 8/25/1999 | 8/25/1999 | A | PART |
Jim Sly
|
|
|
08/25/99 316 - Foot and rebar appears OK
|