Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-02590
StatusFinaled
Name PETER O'NEILL
Site Address 6100 E GATEWAY CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2500 sq. ft. two story single family dwelling (1313 sq. ft. first floor/1187 sq. ft. second floor) with a attached 546 sq. ft. two car garage and a 146 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar protected lot. CU-24-94 per Roger Jones. PC#705 (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/12/20001/13/20001/13/2000PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/12/2000 at 17:04:01. Contact: .
BLD-Final1/10/20001/10/20001/10/2000PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/10/2000 at 07:37:58. Contact: .
BLD-Energy code compliance11/16/199911/16/199911/16/1999PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/16/1999 at 10:26:30. Contact: .
BLD-Framing/Rough-in11/15/199911/16/199911/16/1999ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/15/1999 at 16:46:36. Contact: .
BLD-Framing/Rough-in11/12/199911/15/199911/15/1999AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/12/1999 at 15:43:03. Contact: . Corrections posted.
BLD-Framing/Rough-in11/11/199911/12/199911/12/1999AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/11/1999 at 09:53:46. Contact: . No plans.
BLD-Other11/3/199911/4/199911/4/1999APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/03/1999 at 15:53:18. Contact: . Ok to side.
BLD-Other11/2/199911/3/199911/3/1999ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/02/1999 at 14:38:24. Contact: .
BLD-Framing/Rough-in11/2/199911/2/199911/2/1999AFAIL
DetailsRuss Owen
Left corrections.
INSP - Foundation9/7/19999/7/19999/7/1999PPART
DetailsRuss Owen
MATT ###-####; 9/7 Appears ok, poured before inspection, contractor was told I could be there at 1:30p.m. jrb
INSP - Foundation9/3/19999/3/19999/3/1999PPASS
DetailsRuss Owen
matt- ###-#### foundation insp