BLD-Conference | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PASS |
Tony Young
|
|
|
|
BLD-Grading Inspection | 7/30/2002 | 7/30/2002 | 7/30/2002 | | DONE |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Final | 7/29/2002 | 7/29/2002 | 7/29/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/29/2002 at 08:47:05. Contact: (208)
c of c issued 7/30/2002 9:06:21 AM
|
BLD-Conference | 6/17/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Tony Young
|
|
|
BRANDON ###-#### PLEASE CALL FIRST AS BRANDON IS IN CALDWELL
need to get ALL permits in proper names of who is going to finish projects (due to original contractor is not finishing project) and get sign offs from all including public works,, then call for structural final. 6/18/2002 3:17:54 PM
|
BLD-Energy code compliance | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PASS |
Wes Worcester
|
|
|
jay ###-#### energy code
|
BLD-Framing/Rough-in | 1/14/2000 | 1/18/2000 | 1/18/2000 | A | PART |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 01/14/2000 at 13:19:22. Contact: ###-####. Ok to insulate finish truss engineering & shear nailing. 1/18/00 1:31:28 PM
|
BLD-Foundation | 10/20/1999 | 10/21/1999 | 10/20/1999 | A | PASS |
Wes Worcester
|
|
|
wall cling ###-#### after beeb 14236 Provide engineering for garage face shear
|
BLD-Foundation | 10/19/1999 | 10/20/1999 | 10/20/1999 | P | FAIL |
Wes Worcester
|
|
|
Clint ###-#### (after the beep 14236) Not ready
|
BLD-Footing | 10/15/1999 | 10/18/1999 | 10/18/1999 | P | FAIL |
Wes Worcester
|
|
|
cLINT ###-#### BEEP 14236 need Engineer's soil acceptance letter, details on stepped footing and within 10' of the top of the slope.
|