Permit Information
Permit NumberBLD99-02693
StatusFinaled
Name CAPITOL VILLAGE JOINT VENTURE
Site Address 2231 UNIVERSITY DR
Project NameCAPITOL VILLAGE BLDG. 2
Customer Number 
ePlanReviewNo
Description
CAPITOL VILLAGE BUILDING #2 * TO CONSTRUCT A NEW 2810 SQ. FT., ONE STORY FUTURE RETAIL SHELL BUILDING. BUILT OF MASONRY AND WOOD FRAME CONSTRUCTION. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMET LIST. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH BUILDING FOR OCCUPANCY. SITE GRADING AND DRAINAGE WAS SUBMITTED UNDER BLD99-02219. FIRE RISERS PROVIDED IN EACH BUILDING FOR FUTURE TENANT IMPROVEMENT. DRH99-0123/CUP99-0064/PC#711-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/15/20008/15/20008/15/2000PPASS
DetailsJim Storey
Added by Inspector: 301 On 8/15/2000 l/c ok pending all sign offs.
BLD-Final7/27/20007/27/20007/27/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/27/2000 at 07:36:46. Contact: ###-####. Scheduled by a pending s/icontractor via Hello! on 07/27/2000 at 07:36:46. Contact: ###-####. 7/27/2000 3:25:33 PM
FIRE-Final Inspection7/27/20007/27/20007/27/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/27/2000 at 07:36:24. Contact: ###-####.
FIRE-Final Inspection7/18/20007/19/20007/19/2000ANR
DetailsRick Jackson
bob wheeler --###-#### fire fn awaiting sprinkler requirements 7/20/00 8:47:04 AM
FIRE-Sprinkler Rough-in6/21/20006/21/20006/21/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/21/2000 at 08:22:03. Contact: ###-####. - hydro okay
FIRE-Supply Line Flush6/12/20006/12/20006/12/2000PPASS
DetailsRick Jackson
bld #2 ###-#### fire Flush ok 6/13/00 2:37:56 PM
FIRE-Final Inspection5/31/20005/31/20005/31/2000ACANC
DetailsJim Storey
David Gates ###-####
FIRE-Supply Line Flush5/30/20005/30/20005/30/2000PNR
DetailsRick Jackson
Dave ###-#### Water valve not accessible- United Water to repair. 5/31/00 9:25:28 AM
FIRE-Supply Line Flush5/22/20005/23/20005/23/2000AFAIL
DetailsRick Jackson
###-#### Contractor not on site. 5/23/00 2:11:20 PM
FIRE-Supply Line Hydro5/22/20005/23/20005/23/2000PFAIL
DetailsRick Jackson
###-#### Contractor not available 5/24/00 3:02:50 PM
BLD-Framing/Rough-in3/16/20003/17/20003/17/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/16/2000 at 15:27:46. Contact: ###-####.
BLD-Framing/Rough-in3/9/20003/10/20003/10/2000PPASS
DetailsJim Storey
###-#### Shear ok. 3/14/00 11:27:22 AM
FIRE-Supply Line Flush2/28/20002/28/20002/28/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/28/2000 at 09:16:51. Contact: ###-####. Underground ok to cover. 3/1/00 10:56:06 AM
BLD-Framing/Rough-in2/9/20002/10/20002/10/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/09/2000 at 15:27:13. Contact: ###-####.
BLD-Framing/Rough-in2/2/20002/3/20002/3/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/02/2000 at 16:24:22. Contact: ###-####. Top out on walls pending SI report. 2/4/00 11:53:24 AM
BLD-Framing/Rough-in1/31/20001/31/20001/31/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/31/2000 at 09:45:48. Contact: ###-####. places with special insp . 2/1/00 9:07:55 AM
BLD-Framing/Rough-in1/27/20001/27/20001/27/2000PPART
Details
Scheduled by a contractor via Hello! on 01/27/2000 at 10:40:23. Contact: ###-####. made ok to pour pending sp insp report 1/27/00 6:38:43 PM
BLD-Framing/Rough-in1/25/20001/26/20001/26/2000APART
Details
Scheduled by a contractor via Hello! on 01/25/2000 at 16:58:33. Contact: ###-####. pending sp insp approvals 1/26/00 10:45:43 AM
BLD-Foundation12/23/199912/23/199912/23/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/23/1999 at 07:48:54. Contact: ###-####. Placed w/special insp. pending report.
BLD-Footing12/20/199912/22/199912/22/1999AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/1999 at 15:19:35. Contact: ###-####. Engineer to address 1906.1-1906.312
BLD-Footing12/16/199912/17/199912/17/1999PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/1999 at 13:49:13. Contact: ###-####. Pend. SI report.