Permit Information
Permit NumberBLD99-02802
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1622 S LOGGERS POND PL
Project NameRIVER QUARRY APT
Customer Number 
ePlanReviewNo
Description
BUILDING # 5, (SECTION 2 OF 2) A TWO-HOUR AREA SEPARATION WALL WILL BE USED TO DIVIDE THIS 8 UNITS, TYPE 1 BUILDING INTO TWO SEPARATE BUILDINGS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 4 UNIT APARTMENT BUILDING. EACH UNIT IS 1206 SQ.FT. MULTI STORY, 2 BEDROOMS AND 2 AND 1/2 BATHROOMS, WITH A 560 SQ.FT. GARAGE. THE INSTALLATION OF A NFPA 13-R FIRE SPRINKLER SYSTEM IS REQUIRED AND CANNOT BE USED FOR ANY REDUCTION OF BUILDING CODE REQUIREMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. MJP (P.C.# 438-99) REFER TO BLD99-01718 FOR OTHER SECTION OF THIS BUILDING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20007/24/20007/24/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/21/2000 at 17:59:20. Contact: ###-####.
Permanent Occupancy 7/24/20007/24/2000 DONE
Details
BLD-Final7/20/20007/20/20007/20/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/20/2000 at 10:59:43. Contact: ###-####.
BLD-Final7/18/20007/19/20007/19/2000PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/18/2000 at 18:39:32. Contact: ###-####.
FIRE-Final Inspection7/11/20007/12/20007/13/2000APASS
DetailsRick Jackson
###-####; occupancy approved
BLD-Framing/Rough-in3/1/20003/3/20003/3/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/01/2000 at 15:36:21. Contact: ###-####.
BLD-Framing/Rough-in2/29/20003/2/20003/2/2000PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/29/2000 at 16:00:18. Contact: ###-####. Canc. 3/2/00 2:25:09 PM
BLD-Energy code compliance2/28/20002/29/20002/29/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/28/2000 at 10:14:45. Contact: ###-####.
BLD-Framing/Rough-in2/22/20002/23/20002/23/2000PPART
Details
Scheduled by a contractor via Hello! on 02/22/2000 at 11:44:27. Contact: ###-####. made ok to insulate, still need mech rough signoff and confirm the penetrations at the 2-hour roof protected area. 2/23/00 7:13:25 PM
BLD-Conference11/9/199911/9/199911/9/1999APASS
DetailsJim Storey
BLD-Conference11/9/199911/9/199911/9/1999APASS
Details
FIRE-Conference11/9/199911/9/199911/9/1999APASS
DetailsRick Jackson
FIRE-Sprinkler Rough-in11/1/199911/2/199911/2/1999APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/01/1999 at 15:20:32. Contact: ###-####. Supply line cover inspection- ok to cover
BLD-Foundation10/21/199910/21/199910/21/1999PPART
DetailsJim Storey
PRESTON Pend report
BLD-Footing10/19/199910/20/199910/20/1999APART
DetailsJim Storey
preston ###-#### pending report