BLD-Final | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/6/2000 2:01:25 PM l/c
|
BLD-Framing/Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 | P | PASS |
Jim Storey
|
|
|
tim ###-#### fr
|
BLD-Concrete | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PASS |
Jim Storey
|
|
|
flat work/slab concrete tim ###-#### Ok to pour, R-bar placed
|
BLD-Concrete | 10/14/1999 | 10/15/1999 | 10/15/1999 | A | FAIL |
Russ Owen
|
|
|
jene-- ###-#### concrete ceiling over wine cellar & gar floor Need 2" clearance also rebar mat is reversed, left correction with contractor.
|
BLD-Foundation | 10/1/1999 | 10/4/1999 | 10/4/1999 | P | PASS |
Wes Worcester
|
|
|
GENE ###-####
|