BLD-Final | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 07:37:12. Contact: ###-####. C/C #16015. 1/25/00 12:12:10 PM
|
BLD-Framing/Rough-in | 11/18/1999 | 11/18/1999 | 11/17/1999 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 11/17/1999 | 11/17/1999 | 11/17/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 08:25:17. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/14/1999 | 11/15/1999 | 11/15/1999 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/14/1999 at 18:12:14. Contact: ###-####. C/N.. Truss eng. To ok truss install; need engineering overheight walls.
|
BLD-Other | 11/10/1999 | 11/10/1999 | 11/11/1999 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 06:56:00. Contact: ###-####. Shear wall ok
|
BLD-Foundation | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | FAIL |
Alan Hauser
|
|
|
###-#### poured
|
BLD-Footing | 10/8/1999 | 10/11/1999 | 10/11/1999 | A | PART |
Alan Hauser
|
|
|
Jed, ###-#### : ) ftngs only and set back
|