BLD-Final | 1/20/2000 | 1/21/2000 | 1/21/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 15:32:28. Contact: ###-####. C/C #17231. 1/21/00 1:58:55 PM
|
BLD-Wall cover | 11/10/1999 | 11/12/1999 | 11/12/1999 | A | PASS |
Jim Sly
|
|
|
Frame and energy code pass.
|
BLD-Framing/Rough-in | 11/8/1999 | 11/8/1999 | 11/8/1999 | P | PASS |
Jim Sly
|
|
|
peter ###-####
|
BLD-Framing/Rough-in | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PART |
Jim Sly
|
|
|
SHEAR NAIL DON ###-#### Shear wall ok
|
BLD-Foundation | 10/15/1999 | 10/15/1999 | 10/15/1999 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/15/1999 at 06:11:59. Contact: ###-####.
|
BLD-Footing | 10/14/1999 | 10/14/1999 | 10/14/1999 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/14/1999 at 05:04:57. Contact: ###-####. Footings appear ok
|