BLD-Final | 4/18/2003 | 4/18/2003 | 4/18/2003 | P | PASS |
Tom Arcoraci
|
|
|
Ted @ ###-#### ok to reopen per George.
|
BLD-Energy code compliance | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 11/9/2001 2:38:17 PM
|
BLD-Framing/Rough-in | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PASS |
Jim Storey
|
|
|
###-#### TED need ele insp. framing ok. 10/19/2001 11:39:02 AM
|
BLD-Footing | 9/13/2001 | 9/14/2001 | 9/14/2001 | P | PART |
Jim Storey
|
|
|
###-#### TED ft ok 9/14/2001 4:49:21 PM
|
BLD-Wall cover | 1/22/2001 | 1/23/2001 | 1/23/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/22/2001 at 16:15:13. Contact: ###-####.
|
FIRE-Final Inspection | 12/7/1999 | 12/7/1999 | 12/7/1999 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/07/1999 at 11:19:29. Contact: . Framing ok no Ele. Work done not clear on plan if garage will have Ele. Noted on site roof frame ok.
|
FIRE-Final Inspection | 12/7/1999 | 12/7/1999 | 12/7/1999 | P | CANC |
Rick Jackson
|
|
|
Fire inspection not required.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/15/1999 | 11/15/1999 | P | PASS |
Jim Storey
|
|
|
ted ###-#### Shear ok.
|
BLD-Foundation | 10/18/1999 | 10/18/1999 | 10/18/1999 | P | PASS |
|
|
|
###-####--victor found wall insp Ok to pour/ Doweled to exisiting
|
BLD-Footing | 10/15/1999 | 10/15/1999 | 10/15/1999 | P | PART |
|
|
|
VICTOR--- ###-#### FT INSP Set backs or forms set ready to pour.
|