BLD-Final | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | PASS |
|
|
|
roy ###-#### fn occ need to lower the rest room mirror 1/2 " fyi 5/8/00 11:00:45 AM
|
Permanent Occupancy | | 5/8/2000 | 5/8/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Joe Tawney
|
|
|
after 10:30 Reinsp ok for perm. occ. 5/8/00 9:09:52 AM
|
BLD-Final | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | FAIL |
Joe Tawney
|
|
|
Final fail C/N issued.
|
BLD-Framing/Rough-in | 4/25/2000 | 4/26/2000 | 4/26/2000 | P | PART |
Tom Arcoraci
|
|
|
ok to cover roy brown--###-#### Grid ok 4/28/00 8:52:38 AM
|
BLD-Framing/Rough-in | 2/25/2000 | 2/28/2000 | 2/25/2000 | A | PASS |
Russ Owen
|
|
|
###-#### Ok except for Pizza over not in place and needs connections and roof loads ok'd by Joist Manufacture, as per written on plans. 2/28/00 2:44:15 PM
|
BLD-Framing/Rough-in | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 14:22:10. Contact: ###-####. Will be done by 407
|
BLD-Framing/Rough-in | 2/3/2000 | 2/4/2000 | 2/7/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### Prior C/N not complied with, need engineer to approve the strap attachments to CMU wall. 2/7/00 1:27:29 PM
|
BLD-Framing/Rough-in | 1/27/2000 | 1/28/2000 | 1/28/2000 | A | PART |
Jim Sly
|
|
|
fred ###-#### roof sheating nailing ok \\ c\n eng to provide detail for da18 straps at roof\ wall not lined up with roof. 1/28/00 12:46:27 PM
|
BLD-Concrete | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PASS |
Wes Worcester
|
|
|
###-#### Done by B. Archibald 1/14/00-final lift ok. 1/19/00 1:46:48 PM
|
BLD-Foundation | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | PASS |
|
|
|
cord--- ###-#### masonary insp INSPECTED BY AND APPROVED BY 325 1/20/00 1:49:18 PM
|
BLD-Concrete | 12/23/1999 | 12/27/1999 | 12/27/1999 | A | PASS |
Russ Owen
|
|
|
###-####. Masonry wall.
|
BLD-Concrete | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | FAIL |
Wes Worcester
|
|
|
Cordel- ###-####; requested inspection for 10 am. Illegible plans, rebar not tied or clipped in place (reinforcing isolators).
|
BLD-Foundation | 11/22/1999 | 11/22/1999 | 11/22/1999 | P | PART |
|
|
|
will pour at 3:00\###-#### Made ok to pour w/sp. Insp. Approval.
|
BLD-Footing | 11/18/1999 | 11/18/1999 | 11/18/1999 | A | PART |
Wes Worcester
|
|
|
Need special inspection letter & log.
|
BLD-Footing | 11/17/1999 | 11/18/1999 | 11/17/1999 | A | FAIL |
Wes Worcester
|
|
|
FT----- DARRIN ###-#### Rebar not in place.
|