BLD-Final | 10/4/2000 | 10/5/2000 | 10/5/2000 | P | PASS |
Jim Sly
|
|
|
bill Davis ###-####
|
BLD-Energy code compliance | 8/7/2000 | 8/8/2000 | 8/8/2000 | A | PASS |
Jim Sly
|
|
|
bill ###-#### Frame pass 8/8/2000 10:06:56 AM
|
BLD-Conference | 8/7/2000 | 8/7/2000 | 8/7/2000 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/7/2000 w/ Bill Davis re eng'g
|
BLD-Framing/Rough-in | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted 8/4/2000 12:39:21 PM
|
BLD-Framing/Rough-in | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | FAIL |
Carl Dependahl
|
|
|
Re-insp. late afternoon; Bill ###-####.need plan for reinsp 8/4/2000 4:36:32 PM
|
BLD-Framing/Rough-in | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PART |
Jim Sly
|
|
|
###-#### bill\\shear wall Shear nail OK...C/N HDs. 6/26/00 10:28:55 AM
|
BLD-Footing | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PASS |
Jim Sly
|
|
|
BOB ###-####
|
BLD-Footing | 11/1/1999 | 11/2/1999 | 11/2/1999 | A | PART |
Jim Sly
|
|
|
BOB ###-#### Ft. appears ok
|