BLD-Final | 12/27/1999 | 12/28/1999 | 12/28/1999 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 16:51:59. Contact: . LC issued.
|
BLD-Energy code compliance | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 07:41:48. Contact: ###-####.bld framing pass at energy inspection
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | FAIL |
Tom Arcoraci
|
|
|
1-###-#### tim See C/N ok to insulate.
|
BLD-Framing/Rough-in | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Tom Arcoraci
|
|
|
TIM 1-###-#### No stickers.
|
BLD-Foundation | 11/4/1999 | 11/5/1999 | 11/5/1999 | A | PASS |
Alan Hauser
|
|
|
hyrum ###-#### stem wall
|
BLD-Footing | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | FAIL |
Alan Hauser
|
|
|
Dirk ###-#### ready at three Done #316
|