BLD-Final | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Jim Sly
|
|
|
###-#### STRUCTURAL ONLY OK for Perm Occ. 12/12/2001 11:31:00 AM
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Jim Sly
|
|
|
###-#### TOM OK for Temp Occ. C/N obtain Perm Occ status within 90 days. 11/15/2001 10:07:26 AM
|
Code Occupancy Approval | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | FAIL |
Carol Montgomery
|
|
|
Scheduled by Inspector: CAM On 11/14/01 10:24:33 PM Bond in place. Temporary signed. Complete Landscaping and paving at Chinden Blvd. exit 11/14/01 10:32:12 PM
|
FIRE-Final Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/13/2001 2:35:15 PM Fire/life safety OK
|
BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | P | CANC |
Jim Sly
|
|
|
Chuck, ###-#### : )
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | PART |
Jim Sly
|
|
|
WIP 10/8/2001 9:10:01 AM
|
BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Jim Sly
|
|
|
###-#### Framing for Canopy only.........OK. 8/7/2001 2:20:56 PM
|
BLD-Foundation | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | PART |
Tom Arcoraci
|
|
|
mana ###-#### WIP MTI CALLED IN FOR INSP 7/11/2001 9:57:28 PM
|
BLD-Footing | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Jim Sly
|
|
|
mana ###-#### Footings for Gas pump Canopy OK pending special insp and approvals. 7/10/2001 5:02:44 PM
|
BLD-Aging Inspection | 6/29/2001 | 6/29/2001 | 6/29/2001 | | PART |
Jim Sly
|
|
|
Working on project. 6/29/2001 7:47:57 AM
|