BLD-Final | 4/18/2000 | 4/18/2000 | 4/18/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 10:58:24. Contact: ###-####. C/C #17278 4/19/00 9:12:12 AM
|
BLD-Framing/Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 | P | FAIL |
Jim Sly
|
|
|
MIKE ###-#### FR INSP C/N.. Misc. energy code items.
|
BLD-Framing/Rough-in | 12/1/1999 | 12/1/1999 | 12/1/1999 | P | PART |
Jim Sly
|
|
|
mike-- ###-#### shear wall insp C/N.. Ok to side all except panels with HD8A's.
|
BLD-Foundation | 11/5/1999 | 11/5/1999 | 11/5/1999 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 05:58:15. Contact: ###-####.
|
BLD-Footing | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | PASS |
Alan Hauser
|
|
|
MIKE ###-####
|