BLD-Final | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | DONE |
Tony Young
|
|
|
Call to meet // Debra Phone #: ###-####// project was done prior,, maintenance for cable is maintained by owner,, spacing is 4",, verified smoke detector locations
|
DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Other | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | PEND |
Bob Archibald
|
|
|
Ok for reactivation with 2hr addmin fee to obtain final inspection.
|
BLD-Conference | 8/7/2000 | 8/7/2000 | 8/7/2000 | A | PART |
|
|
|
with 305 to discuss rail system proposed repair with 305,301, 325 and dwayne carver, parts installed will be acceptable if they are secured at the bottom and are no farther apart than the two that are installed for demonstatiion. 8/7/2000 5:02:33 PM
|
BLD-Conference | 6/14/2000 | 6/14/2000 | 6/14/2000 | A | PART |
|
|
|
received letter from architect my response is attached. his letter in file.
|
BLD-Conference | 6/7/2000 | 6/7/2000 | 6/7/2000 | A | PASS |
|
|
|
as there has been no contact (letter from) Mr. Carver The attached letter is being sent to his office.
|
BLD-Conference | 5/31/2000 | 5/31/2000 | 5/31/2000 | | PASS |
|
|
|
met on the jobsite with 305, dwayne carver, on the lack of compliance for the cable guardrails used for intermediate fall protection. Mr carver is to draft a letter to the city requesting acceptance standards for the new rail of the elevated deck. 305and myself are to research and call icbo for more info.
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | FAIL |
|
|
|
railing Chris Larson ###-#### please call before you go out correction still stands 5/31/00 3:35:13 PM
|
BLD-Final | 5/24/2000 | 5/25/2000 | 5/25/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 11:53:33. Contact: ###-####. 97-ubc 509.3 guardrail intermediates are cables 3 7/8" o.c. and are too light and do not have enough available tension to be complying 5/26/00 6:59:44 AM
|
BLD-Energy code compliance | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/17/2000 at 09:51:14. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/14/2000 | 3/15/2000 | 3/15/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 11:11:15. Contact: ###-####. Not ready. 3/16/00 1:28:52 PM
|
BLD-Framing/Rough-in | 3/15/2000 | 3/15/2000 | 3/15/2000 | P | PASS |
Russ Owen
|
|
|
rescheduled from this am ok to insulate 3/16/00 1:44:23 PM
|
BLD-Framing/Rough-in | 2/11/2000 | 2/11/2000 | 2/11/2000 | P | PART |
Russ Owen
|
|
|
###-#### Ext. only C/N on job card. 2/14/00 1:59:55 PM
|
BLD-Footing | 1/6/2000 | 1/6/2000 | 1/6/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/06/2000 at 10:27:09. Contact: ###-####. Interior footings.
|
BLD-Foundation | 12/8/1999 | 12/9/1999 | 12/9/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/08/1999 at 09:42:36. Contact: ###-####.
|
BLD-Footing | 11/8/1999 | 11/10/1999 | 11/10/1999 | A | PASS |
Jim Storey
|
|
|
scott---###-#### cell ft -behind house Footings ok.
|