BLD-Final | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PASS |
Jim Sly
|
|
|
###-#### garage code 1234 C/C #17319 4/13/00 1:06:28 PM
|
BLD-Final | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | FAIL |
Alan Hauser
|
|
|
###-####\\garage code is 123 enter Left C/N 4/7/00 12:32:50 PM
|
BLD-Energy code compliance | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PASS |
Jim Sly
|
|
|
COLE ###-####
|
BLD-Framing/Rough-in | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | PASS |
Jim Sly
|
|
|
REINSPECTION ###-#### Strap in garage installed.
|
BLD-Framing/Rough-in | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/18/1999 | 11/19/1999 | 11/19/1999 | P | FAIL |
Jim Sly
|
|
|
LATE PM PLEASE COLE ###-#### Not ready.
|
BLD-Framing/Rough-in | 11/15/1999 | 11/15/1999 | 11/15/1999 | P | PART |
Jim Sly
|
|
|
SHEAR WALL COLE ###-#### Shear wall ok.
|
BLD-Framing/Rough-in | 11/12/1999 | 11/12/1999 | 11/12/1999 | P | FAIL |
Jim Sly
|
|
|
shear wall cole ###-#### C/N.. Shear per. Eng.
|
BLD-Foundation | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 12:53:17. Contact: ###-####.
|
BLD-Footing | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PART |
Jim Sly
|
|
|
cole ###-#### or ###-#### Footing appears ok
|