BLD-Final | 2/24/2000 | 2/25/2000 | 2/25/2000 | A | PART |
|
|
|
ray ###-#### fn occ made ok for temp per 409 and report copy on site for the alarm system. still adjusting the double doors and installing smoke seals 2/28/00 8:08:22 AM
|
FIRE-Final Inspection | 2/24/2000 | 2/24/2000 | 2/24/2000 | P | FAIL |
Rick Jackson
|
|
|
###-####-- ray fire fn C/N issued. 2/25/00 9:41:09 AM
|
BLD-Framing/Rough-in | 1/26/2000 | 1/26/2000 | 1/26/2000 | P | PART |
|
|
|
ceiling grid and bracing insp Ray Hroma ###-#### ok to drop in tiles 1/27/00 6:46:58 PM
|
BLD-Framing/Rough-in | 12/27/1999 | 12/28/1999 | 12/28/1999 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 12/27/1999 at 16:29:04. Contact: ###-####. Made ok to cover/ will check wall bracing @ final or ceiling grid insp.
|
BLD-Framing/Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | FAIL |
|
|
|
###-####. Still need elec./ plmg. signoff.
|