BLD-Final | 3/22/2000 | 3/22/2000 | 3/22/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/22/2000 at 06:08:38. Contact: ###-####. See C/notice 3/22/00 1:07:27 PM
|
BLD-Footing | 12/16/1999 | 12/17/1999 | 12/17/1999 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 20:27:35. Contact: . Changed to framing.
|
BLD-Framing/Rough-in | 12/17/1999 | 12/17/1999 | 12/17/1999 | A | PASS |
Russ Owen
|
|
|
This is a framing inspection, not footing.
|
BLD-Energy code compliance | 12/15/1999 | 12/16/1999 | 12/16/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 07:51:15. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/16/1999 | 12/16/1999 | 12/16/1999 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 06:50:56. Contact: ###-####. Side nailing truss hangars, truss brace.
|
BLD-Framing/Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 19:28:51. Contact: ###-####. Partial inspect only, needs electric and plumbing.
|
BLD-Wall cover | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/09/1999 at 11:03:12. Contact: ###-####.
|
BLD-Foundation | 11/12/1999 | 11/12/1999 | 11/12/1999 | A | FAIL |
Russ Owen
|
|
|
Walls poured with-out inspection, foam boards already striped off.
|
BLD-Foundation | 11/10/1999 | 11/12/1999 | 11/10/1999 | A | PASS |
Russ Owen
|
|
|
MANA ###-#### FOUND WALL. Instructed to take photographs and verify hold-downs.
|
BLD-Footing | 11/10/1999 | 11/10/1999 | 11/10/1999 | P | FAIL |
Jim Storey
|
|
|
Placed W/O insp. many cell phone calls work proceeded w/o insp.
|
BLD-Footing | 11/9/1999 | 11/10/1999 | 11/10/1999 | A | PASS |
Jim Storey
|
|
|
Dave ###-####. Instructed to verify setbacks.
|